Loading…
Loading…
Found 2 active tenders
2 results • Latest
PROVN OF WASTE DISPOSAL FACILITY WITH ANCILLARIES AT ALONG MIL STN
Excavation in post holes (or similar holes) each not exc 0.5 Cum and getting out, returning filling in and ramming earth or borken rubble mixed with earth around in layers not exc 25cm watering and removing surplus spoil to a distance not exc 50m and making good surface in soft/loose soil all as specified and directed.
Package III Civil Works of Power Intake, Head Race Tunnel, Surge Shaft, Valve chamber, Pressure Shafts and Penstock, Underground Powerhouse Complex (comprising of Powerhouse Cavern, Transformer - GIS Cavern, etc. of Tato II HEP
CONTROL OF WATER, CONSTRUCTION DRAINAGE AND DEWATERING Control of water, dewatering of surface/underground construction sites including all construction works, labor, plants and materials necessary to keep the construction sites free of water during the contract period. Complete in all respect as per technical specification, drawings and as directed by Engineer-in-Charge.