Loading…
Loading…
519 results • Latest
Estimate for advance planning for restoration of HT LT Line at different locations damaged due to rainfall snow fall in various City Electrical Sub Divisions under the jurisdiction of this City Electrical Division, HPSEBL, Shimla for year 2026-27
Disconnector assembly kit suitable for fitment with 42 KV LA, confirming IEC-60099- 4 Ed 2.2.2009-05 as per RDSO policy letter no. TI-PSI-MOGTLA-0101 (02/2015) dated: 15.02.2015 with CPRI/NABL accredited lab test report, RDSO Maintenance Inst.no.TI/MI/0048 or latest.
Construction of Community Hall along with Meeting Hall
Construction of Berms both sides at Rd 0/00 to 0/705 , U-Shape Drain at RD 0/390 to 0/530 and 0/635 to 0/670 RHS on Lubh Mastgarh Jounta Road Km 0/0 to 10/0)
RM of stairs and pathways in alley No9 at Lower Bazar along with drain and Nallah in Lower Bazar and Ram Bazar in ward No14 15
Construction of Missing CD 900mm dia Hume Pipe Culvert at RD 5/410)