Loading…
Loading…
5,308 results • Latest
SH Repair.Protection of abutments, wing walls and flooring of slab culvert at Km. 37.135
SH Deployment Hiring of JCB Excavator cum loader for removal of slips in various RDs
SH Deployment Hiring of JCB Excavator cum loader for removal of slips in various RDs
SH Deployment Hiring of JCB/Excavator cum loader for removal of slips in various RDs
SH Deployment.Hiring of JCB.Excavator.cum loader for removal of slips on above roads at various RDs
R/R of Damages on Tharolla Balog Pujahi Road Km 0/00 to 6/00 C/o R/wall at RD 0/090 to 0/100, 0/270 to 0/290, 0/875 to 0/890, 1/600 to 1/620 and B/wall at RD 0/240 to 0/252
SH Deployment Hiring of JCB Excavator cum loader for removal of slips landslide at various RDs
R/R of Damages on Tharolla Pujahi via Chhanj Km 0/00 to 6/100 C/o B/wall at Rd 0/100 to 0/110, 0/130 to 0/180 and 0/205 to 0/225
R/R Damages on Chole Gahrog to Bari Road Km 0/00 to 3/370 C/o PCC R/wall at RD 1/995 to 2/011)
SH C.O wire crate B.wall at Km. 0.484 to 0.538.80
R/R of Damages on Tharolla Pujahi via Chhanj Road Km 0/00 to 6/100 C/o R/wall at RD 1/455 to 1/465 and B/wall at RD 1/525 to 1/537, Both side wing wall, U/S and D/S toe wall at RD 1/025,1/100,1/270,1/450
C/O PCC R/wall at km 4/840 to 4/865
RMO Central Heating Plant installed at Gorton Castle Building (AG Office), Shimla . (HP) for 2026-27. (Sh:- Running operation of Boiler).
Anti Vibration mounting complete assembly
.
R.R damages on Bhutti Kharahan Road Km 0.000 to 12.000 SH. C.O R.wall at Km 9.810 to 9.818 and C.O PCC V.Shape Drain at Km 10.300 to 10.800
R.R Damages on various roads under Nankhari section HPPWD Sub Division Nankhari SH Removal of Landslides and Slips at various Roads and RDs
High performance Anti Corrosive Epoxy
SH Preparation of survey plan using modern road designing softwires using Autodesk Civil 3D for geometric alignment Traffic survey Design of Pavement and conduction of geotechnical investigations by CBR test from Km 0.000 to 16.000
R/R Damages on Kalbog to Chuila Road Km 0/00 to 6/500 C/o R/wall at RD 3/730 to 3/755
R.R Damages on TJGNK Road KM 0.000 to 52.000 SH C.O B.wall and PCC U-Shape Drain at Km 23.065 to 23.105.
SH 5/7 mtr wide formation cutting at RD 0/00 to 0/300
R/R Damages on Oddi Jarai Road KM 0/00 to 6/500 C/o B/wall at RD 0/850 to 0/872.50 and R/wall at RD 3/455 to 3/474.50
SH F/C 5/7 mtr wide road at RD 0/00 to 0/555 Deposit under head VKV/2025/1
C.o New Proposed Bus Stand in Nankhari preparation of detailed estimate for proposed Bus Stand in Nankhari.
SH Construction of R/wall at RD 0/060 to 0/085 and B/wall at RD 0/095 to 0/115
SH Construction of R/wall at RD 0/450 to 0/466 and B/wall at RD 0/460 to 0/470
SH Providing and laying Pot Hole , Bitumen Concrete and 2.5 mm thick road marking strips in Km 2/00 to 3/00
SH Providing and laying Pot Hole , Bitumen Concrete and 2.5 mm thick road marking strips in Km 2/00 to 4/765
SH C/O B/wall at RD 2/200 to 2/050 and 2/090 to 2/140)
Improvement of Link road from Mail Nalla to Majewate in K.M. 0/00 to 1/760, Improvement of curves between various Rds
Estimate for shifting 11KV Kasumpti line from four pole structure chelli to near DPS School in Electrical Section Panthaghati under ESD Kasumpti.Shimla-9
AR and MO of LWSS Giri Khad To Nehraghati in GP Kiari Baghar and Panog in Tehsil Kotkhai Distt Shimla HP SH Construction of 1 No Intake Chamber C/O 1 No RCC storage tank 10000 Ltrs Cap T/L and Laying of GMS tube 20mm dia 950 Rmt 15mm dia 200 Rmt
Stock storage under JS Division Jubbal in Tehsil Jubbal District shimla HP SH Providing and Fixing CGI sheet roofing Destempering Painting and repair work in store building at Paccapatter
Repair and maintenance of LIS for horticultue land of various panchyats under Tehsil Rohru Jubbal Kotkhai Phase IlIrd Distt Shimla HP SH Repair of Storage Tank of various Capacity in GP Baghar Panog and Pandli
Improvement of Sewerage scheme to Saraswati Nagar in Tehsil Jubbal Distt Shimla HP SH Providing and fixing of sludge wasting system to Sludge Drying Beds
R/R of Damages on link road from Jalath -I to Jalath-II km 0/00 to 0/900 C/o R/Wall at RD 0/525 to 0/555 0/840 to 0/855 and at RD 0/575 to 0/595
Providing LWSS NC/PC habitations Brall in GP Brall in Tehsil Rohru Distt Shimla HP SH White washing Painting Distempering and tilework
R/R of Damages on link road from Jalath-I to Jalth-II in Km 0/00 to 0/900 C/o Up-gradation/Improvement of ROFD in Km 0/100 to 0/255 and R/wall at RD 0/030 to 0/043, 0/220 to 0/235, 0/357 to 0/372, 0/392 to 0/409
C/O PCC R/Wall between RD 24/705 to 24/725).(Under PDNA)
R/R of Damages on Jalth-I to Jalth-II Road Km 0/00 to 3/00 C/o R/wall at RD 0/068 to 0/083
ANTI ROLL BAR BRACKET etc.
Manpower Outsourcing Services - Minimum wage - Unskilled; High School; Others
Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others
Monthly Basis Cab & Taxi Hiring Services - Sedan; 2000 km x 320 hours; Local 24*7
Manpower Outsourcing Services - Minimum wage - Skilled; Graduate; Admin
Industrial Safety Helmet (V3) ISI marked to IS 2925 (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No