Loading…
Loading…
288 results • Latest
Resurvey of Humcha RF Block I & II Reserved Forest, with its boundary length measuring approximately 23.50 Km in Hosanagara Range, Sagara Division, during 2026-27.
Resurvey of Guruvanakote Block Reserved Forest, with its boundary length measuring approximately 16.00 Km in Byndoor Range, Kundapura Division, during 2026-27.
Resurvey of Kadike Reserved Forest, with its boundary length measuring approximately 18.00 Km in Byndoor Range, Kundapura Division, during 2026-27.
Resurvey of Talaguppa RF Reserved Forest, with its boundary length measuring approximately 7.00 Km in Sagara Range, Sagara Division, during 2026-27.
Resurvey of Yadehalli Block-I Proposed Reserved Forests Notified U/s 4 of KFA-1963 with its boundary length measuring approximately 15.00 Km in Anandapura Range, Sagara Division, during 2026-27, in order to provide technical support to the FSO & the DCF during the process of settlement and preparation of Settlement Map to be signed jointly by the both and also for preparation of Tie-line Map and Draft Notification proposed U/s 17 of KFA 1963.
Demarcation of Surveyed Boundary of Albady Block Reserve Forest by Construction of 18 RCC Pillars of specified dimensions at the given locations along the Notified Forest Boundary in Hebri Range of Kundapura Division during 2026-27.
Resurvey of Kodiyadibeliyuru Block Bit I & II Proposed Reserved Forests Notified U/s 4 of KFA-1963 with its boundary length measuring approximately 09.00 Km in Puttur Range, Mangalore Division, during 2026-27, in order to provide technical support to the FSO & the DCF during the process of settlement and preparation of Settlement Map to be signed jointly by the both and also for preparation of Tie-line Map and Draft Notification proposed U/s 17 of KFA 1963.
Resurvey of Hirebandady Bit I & II Proposed Reserved Forests Notified U/s 4 of KFA-1963 with its boundary length measuring approximately 25.00 Km in Puttur Range, Mangalore Division, during 2026-27, in order to provide technical support to the FSO & the DCF during the process of settlement and preparation of Settlement Map to be signed jointly by the both and also for preparation of Tie-line Map and Draft Notification proposed U/s 17 of KFA 1963.
Resurvey of Ramachandrapura RF APAJI 51 Reserved Forest, with its boundary length measuring approximately 11.65 Km in Nagara Range, Sagara Division, during 2026-27.
Resurvey of Ramachandrapura RF APAJI 42 Reserved Forest, with its boundary length measuring approximately 7.23 Km in Nagara Range, Sagara Division, during 2026-27.