Loading…
Loading…
932 results • Latest
Goramadugu-2009 Unit No -06 Extraction and transportation of Eucalyptus pulpwood at Banglore Division
Jakkasandra-2017 Unit No-03 Extraction and transportation of Eucalyptus pulpwood at Banglore Division
Ujjani-2010 Unit No -02 Extraction and transportation of Eucalyptus pulpwood at Banglore Division
Rayasandra-1994 Unit No 04 Extraction and transportation of Eucalyptus pulpwood at Banglore Division
Goramadugu-2010 Unit No -07 Extraction and transportation of Eucalyptus pulpwood at Banglore Division
Koramanagla-1995 Unit No -05 Extraction and transportation of Eucalyptus pulpwood at Banglore Division
BEARINGS
Supply of Medical Consumables Surgical Items
Orient electric Miniature Circuit Breaker, 6 Ampere Brand: Orient electric (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687764259993 dt.14/05/2026)
Sub estimate for AME of UTP Dam which includes replacing of LBC service gate & emergency stop gate Rubber seals , Provision of Security room & chummari block Roof sheeting work for the year 2025-26
Removal of silt in Nayi halla branch canal Lottery halla Pick up canal Mugurukoppalu pickup canal Kennalu pickup canal Darasaguppe branch canal Harohalli branch canal Railway Pickup canal and Purandara branch canal under 13A dy and Harohalli branch canal Haralahalli branch canal Tollgate pickup canal and Mantapa pickup canal under 13B dy and Kuratti dy Vadesamudra dy 52nd PO canal Thalashasana pickup canal under 24th Distributary of VC and 22nd A Dy Singanahalla pickup canal and Ramabhana canal of Hirode tank under VC Main Canal
Welding Electrode-Covered Arc Welding Electrode-Rutile Type (BEML) (Q3)
Transportation of forest produce from Koppa Division Sringeri range , Nilandur plantation to GTD Sanagameshwar Pete Under KSFIC Shimoga.
Improvements of Park at Sominakoppa Adarsh Nagara Park-2, Shivamogga with in SBUDA Limit
Providing and Fixing Children Play Equipments in selected parks at North side, Shivamogga with in SBUDA Limit
Providing and Fixing Children Play Equipments in selected parks at South side, Shivamogga with in SBUDA Limit
Providing and Fixing Children Play Equipments in selected parks at Swami Vivekananda and Gopalagowda Layout, Shivamogga with in SBUDA Limit
Improvements of Park at Bommanakatte Ashraya Badavane B-Block, Shivamogga with in SBUDA Limit
Improvements of Park at Purale Okkaligara Keri, Shivamogga with in SBUDA Limit
Providing RCC Slab for Storm Water Drain at Bsavanagudi Praveen House Back Side, Shivamogga with in SBUDA Limit
Improvements of Park Near Vruddrashrama At Swami Vivekanda Layout, Shivamogga with in SBUDA Limit
Improvements of Park at Pace College Beside Shri Shaila Mallikarjuna Layout, Shivamogga with in SBUDA Limit
Improvements of Park at Chalukya nagara Kuvempu Park, Shivamogga with in SBUDA Limit
Improvements of Park at Golden City 4th Cross Park , Shivamogga with in SBUDA Limit
Improvements of Park at Jayadeva Badavane, Shivamogga with in SBUDA Limit
Improvements of Park at Rashinfra layout, Near old Bommanakatte, Shivamogga with in SBUDA Limit
Improvements of Play ground (Stadium) at Shakthidama layout, Shivamogga with in SBUDA Limit
Improvements of Park at Malenadu County Layout, Shivamogga with in SBUDA Limit
Improvements of Park at CITB(Gopala) 2nd Stage Layout, Shivamogga with in SBUDA Limit
Improvements of Park at Sominakoppa Adarsh Nagara Park-1, Shivamogga with in SBUDA Limit
BRAKE LINER SETS
185 SQ MM PVC INSULATED ALUMINIUM CABLE
6 Core 1 point 5 Sq MM PVC Insulated Copper Cable, 3 Core 6 Sq MM PVC Insulated Copper Cable, 3 Core 16 Sq MM PVC Insulated Copper Cable, 3 Core 25 Sq MM PVC Insulated Copper Cable, 3 Core 35 Sq MM Flexible Copper Cable, 3X50 Sq MM Cu. Flexible Cable
PVC PIPES AND SPECIALS
DESB LOAD CELL FOR 100T INMOTION W BRIDGE
Self Priming Pump Conforming To IS5120 (Q3)
WORK
PROVIDING NON CLINICAL STAFF FOR COMMUNITY HEALTH CENTRE HOLALURU
Construction of Foot Bridge across Balekatte Halla Adjecent to PWD SH-148 Near karnalli Village In Talagunda Hobali Shikaripura Taluk (Reserved for CAT II(A))
Construction of Foot Bridge across halla for crossing formers land in Dindadahalli village Hosuru Hobali in Shikaripura Taluk (Reserved for SC)
Construction of Foot Bridge across Hirekaluve Halla Near Barangi Cultivation Land at agrahar muchadi Village Border In Talagunda Hobali Shikaripura Taluk
Construction of Foot Bridge across doddakere halla near attibhail village adjacent to PWD SH-57 in Shikaripura Taluk
Construction of Foot Bridge across Halla From Ambargoppa Village Main Road to Cremation Ground in Udagani Hobali Shikaripura Taluk
Construction of public toilet in TP limits Anavatti
Providing 3rd Party Quality monitering System Services for the River front Area (Sangameshwara Temple Bhadra River)Development Works with in the limit of Bhadravati Tq
Providing 3rd Party Quality monitering System Services for the 60m Road (ABVP Layout) Development Work with in the limit of Shivamogga Tq
Repair of UGD line in 8th cross, Bapuji nagar, ward no.12 of SCC limits
Desilting of Gundappa shed wetwell in SCC limits (Reserved for SC)
Customized High-back seater college buses
LUBRICATION PUMP