Loading
Loading…
Loading…
29 results • Latest
Construction of outlets on Rapti Main Canal in between Km 6.600 to Km 21.00 in District Shrawasti.
Construction of VRB at km 20.550 on Rapti Main Canal in District Shrawasti.
Restoration of internal section of Rapti Link Channel from km 0.00 to km 12.300 in District Shrawasti.
Construction of Side drain and protection work on Left bank of Rapti Main canal From km 28.000 to km 29.300 in District Shrawasti.
Construction of Side drain and Protection work on left bank of Rapti Main canal from km 25.500 to Km. 28.00 in District Shrawasti.
Stone pitching work on internal section of Rapti Link channel from Km 21.100 to Km 21.400 in District Shrawasti.