Loading…
Loading…
2,101 results • Latest
Construction of Chhat Ghat and Talab Beautification Chandrama Tola Ward no.29
Wall Painting Work Red, Yellow and GVP spot at Navjeevan Zone
Renovation of Samudaik bhawan Ward no 25
Interlocking work at Goverment Primary School (Purvi) Simplex at Ward no.12
Construction of Interlocking at Ward no 21
Wiring Maintenance of Nagar Nigam Bus Stop Pratikshalay Waidhan Jayant and Morwa
OPERATION and MAINTENANCE OF MECHANIZED ROAD SWEEPING and ANTISMOG GUN MACHINE MOUNTED ON TRUCK
Construction of Talab Ghat at Ward No.26
Supply of 03 nos New bolero on Rent basis in Muncipal Corporation Singrauli excluding P.O.L, excluding Driver ll call
Water Supply within the Municipal Corporation limits, covering the Baidhan Zone, Rural Zone, and Navjeevan Vihar Zone
Drilling of DTH Tube Well and Hand Pump Installation at Ward No 31
Handling, Transport and Other Mining Services - Percentage quote based - Rate Contract for Transportation of 20 Lakh CuM of Pond Ash from NTPC Vindhyachal for year 26-27
Purchase of OUTDOOR RCC Bench for ward 43
Construction of Pcc Road from Rahul Kirana Store Via Green City to Essar Nala at Ward No 29
DTH Bore and HP Installation at ward no.13 Various Places
Providing and laying Paver Block in Various Places in Ward no.43
Drilling of Gp Bore Ward no 11 Place Shisu Mandir School khel Maidan
Drilling of Gp and DTH Tube Well Drilling and Handpump Installation at Ward No 29
Manpower Outsourcing Services - Minimum wage - Skilled; Secondary School; Admin, Manpower Outsourcing Services - Minimum wage - Unskilled; Middle School; Others, Security Manpower Service (Version 2.0) - Office/Commercial/Institutions/Residential; Unarmed Security Guard
Construction of Drain from Parsad Ji house to Babunandan Ji House at ward no.37
Construction of Pcc Road at Ward no 31 From Harrayi Poorv Main Road to School and Other Places
Construction of SHED for Stray Dogs at Deora ward no. 29
Construction of RCC Drain at Ward No 13
Construction of Bitumen Road at various places in ward no.24
C Type Wedge Connector for ACSR Zebra to Zebra
Meteorology - Rain Gauge, Non - Recording as per IS 5225 (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
CONTRACT FOR SPECIAL MAINTENANCE AND HOUSEKEEPING IN OFF-SITE AREASTAGE-III (PART-G)
CONTRACT FOR SPECIAL ASSISTANCE TO UCB STAFF OF MAIN PLANT STAGE-1DURING SHIFTS (UNIT-1 TO 3) U13 PART-A
LINEAR DETECTION WIRE-part no.-W77123010, GAS MOTOR REPLACEMENT-part no.-MA14167560, LT-10R- CARTRIDGE-part no.-C3131938, BATTERY MODULE-part no.-B114273086, LT-101-30 CARTRIDGE-part no.-C6291875, FORAY DRY CHEMICAL-part no.-7530804, BURST DISC ASSY-part no.-CA14283630, LT-30-R CARTRIDGE-part no.- C0537317, END OF LINE RESISTER ASSY-part no.- WA44265207, BLOW OFF CAP-part no.-BC54151924492856, CYLINDER INERGEN STD.575 CU.FT. W-CV-98-part no.- C154421302
V - Belts - Endless V - Belt for Industrial Purposes as per IS 2494 (Q3) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2)
Coal Exploration Services - 3D Seismic Survey; Not Applicable; Not Applicable; upto 1200m; Not Applicable
Repairing of 04 Nos. Drag Intermediate Pulley and 04 Nos. Boom Center Pulley for 20/90 Bajrang Dragline working at Nigahi Project.
AFDSS spares for Water Sprinklers
Rewinding / Repairing of 01 No. 43.5KW, 600Amp, 3Phase, 440V Welding Generator for 20/90 Dragline at Nigahi Project.
CONTRACT FOR HOUSEKEEPING OF ESP AREA OF MAIN PLANT STAGE-1 UNITS(5AND6)
JOB CONTRACT FOR FUGITIVE DUST CONTROL IN V4A AND B DYKES AREA AT NTPCVSTPS FOR 17 MONTHS
END BIT-part no.-1987131520, END BIT-part no.- 1987131530, CUTTING EDGE-part no.-1987131540, CUTTING EDGE-part no.-1987131550, NUT-part no.- 1987121911, BOLT-part no.-1987121850, BOLT-part no.- 1987121870, WASHER-part no.-1987121890, BOSS-part no.-1987121880
CONSTRUCTION OF ATAL TIKRING LAB AT Govt. HSS GORBI KALRI JP CHITRANGI DISTRICT SINGRAULI (M.P.)
Dismantling/ dis-assembling, re-erection, re-installation, setting and alignment of assemblies / sub-assemblies after repairing on as and when required basis within 730 days in CHP, Nigahi Project
Preservation of store materials, cleaning of store racks, spare parts and other materials and handling of material including jungle cleaning, surface dressing in R/S for period of 2 years at Amlohri Project.
PROCUREMENT OF BHEL TRICHY SPARES
Service contract for installation of digital control system for the servo control on pump AA4VG125 At NTPC Vindhyachal
Construction of WBM Road and HPC From Eklaby vidhyalay to shukla baiga Home at Ward No. 8 Bargawan
CONSTRUCTION OF HPC CULVERT AND RETANING WALL PIPARJHOR NALA NEAR MANRUP BASOR HOUSE WARD NO. 09 AT NAGAR PARISHAD SARAI DISTT. - SINGRAULI (M.P.)
CONSTRUCTION OF W.M.M. ROAD PIPARJHOR NALA TO TENDUDOL BASOR BASTI WARD NO. 08 AT NAGAR PARISHAD SARAI DISTT. - SINGRAULI (M.P.)
CONSTRUCTION OF W.M.M. ROAD PADAI TOLA SCHOOL TO PIPARJHOR NALA WARD NO. 09 AT NAGAR PARISHAD SARAI DISTT. - SINGRAULI (M.P.)
ROUTINE MAINTENANCE WORK OF MP-MDR-12-18 KOLHUA TO BAKHUL ROAD LENGTH 18.00 KM. UNDER SUB DIVISION DEOSAR DISTT- SINGRAULI (M.P.)
CONSTRUCTION OF RCC CULVERT AND RETANING WALL NEAR CHAURA TOLA AT WARD NO. 02 NAGAR PARISHAD SARAI DISTT-SINGRAULI (M.P.)
STMC 3.75 M. BT AND CC. AND 5.50 M. CC ROAD UNDER PWD SUB. DIVISION WAIDHAN DIVISION SINGRAULI DISTT- SINGRAULI (M.P.) TOTAL LENGTH 110.10 KM.