Loading…
Loading…
2,116 results • Latest
Procurement of Motorised High Energy Drain Valves for ST-1 for Vindhyachal, Procurement of Motorised High Energy_ Drain Valves
Fabrication of 01 no. turbocharger guard, repair of 01 no. TC guard, 01 no. engine lower guard, 01 no. transmission guard and 01 no. front radiator guard, repair and cleaning of 01 no. radiator assembly and 01 no. transmission oil cooler on float and
100276563 - 10 - M9463176324 - BRAIDED SPECIAL HOSE, 1 2, 3M, SS304, 100276563 - 20 - M9463176323 - BRAIDED SPECIAL HOSE, 1 2 IN, LENGTH 2MTR, 100276563 - 30 - M1665886774 - HOSE SGL WIRE BRAIDED, NPT-F, 1 4IN, 6MM, 100276563 - 40 - M1660210163 - HOSE, HVY, RBR, IS446, 10.2KG CM2, BSP-FXM, 100276563 - 50 - M9492556003 - HOSE, WIRE BRAID, NPT F, 3 8IN, 100276563 - 60 - M9492556002 - HOSE, 1 2IN, 1M, 100276563 - 70 - M9492556005 - HOSE, 10KG CM2, 100276563 - 80 - M1668030718 - HOSE HOSE, CLAMP, 50MM, 4500MM, 100276563 - 90 - M1668020301 - HOSE, RF-RBR-TEX, CLAMPED, 25MM, 500MM, 100276563 - 100 - M9492556013 - HOSE, WIRE BRAIDED, PTFE TEFLON, 1 4INBSP-F, 100276563 - 110 - M1660990265 - HOSE SSW BRD FLEX, 1 2IN FEM, 100276563 - 120 - M1660990267 - HOSE SS WIRE BRD FLEX, 2M, 100276563 - 130 - M1660990263 - HOSE SSW BRD FLEX, 3 4IN NPT F, 3 4IN
Construction of Interlocking Work and Rcc Drain at Various Places in Ward no 41
Interlocking work at various places in ward No.32
Supply, Installation and Commissioning of Spares for restoration and recommissioning of ESH 20/90 Baidyanath and Bajrang Dragline of Khadia and Nigahi Project respectively
STRENGTHENING OF DEOSAR BY PASS ROAD LENGTH 1.20 KM. UNDER SUB. DIVISION DEOSAR DISTT. SINGRAULI (M.P.)
STRENGTHENING OF KURSA ADIWASI BASTI APPROACH ROAD LENGTH 3.40 KM. UNDER SUB. DIVISION DEOSAR DISTT. SINGRAULI (M.P.)
STRENGTHENING OF PONDI BARIGAWAN TO BARWA TOLA APPROACH ROAD LENGTH 3.00 KM. UNDER SUB. DIVISION CHITRANGI DISTT. SINGRAULI (M.P.)
Manpower Deployment for Conveyor system operation in stage - 5 CHP, NTPCVSTPS for year 2027-2029.
Hiring of the POWERGRID TELESERVICES 512 Mbps Internet Bandwidth link at NTPC Vndhyachal for two years
Leasing of Electric Vehicles (Long Term) - Wet Lease; As per ATC; As Per ATC; As Per ATC; As per ATC
SLING WRE RPE; 18MM, 6M, ST L, Delivery Days SLING WRE RPE; 18MM, 11M, S TL, SLING WRE RPE; 16MM, 3M, ST L, SLING WRE RPE; 12MM, 8M, 5T ON, SLING WEB; 3M, 5TON, PO LYSTR
98 inch LED TV with HDMI eARC
Internal Combustion Engine Crankcase Oils for Automotive Application (V2) Conforming to IS 13656 (Q3) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete
DOOR HINGE-100270990_ M7470266039
Bulk procurement of elastomeric pads for casnub bogies of
PR_ 100277519_ M2697931000_ WATER SYSTEM_ Item-10_ Schedule-1
Procurement of LT motor at NTPC Vindhyachal
Smart Forest Sticks for Protection against Animal Attacks
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra Scorpio or equivalent vehicles such as Mahindra XUV 700 Tata Safari etc; The vehicle to be deployed should not be more than three years old in case of light vehicles from the da..
Procuremnt of LT Motors for Unchahar and Vindhyachal
Procurement of Elecon Make Gear Box spares for Conveyor Drives of CHPStage-1 at NTPC Singrauli.
Facility Management Services - LumpSum Based - Industrial; Housekeeping, OVERALL RUNNING AND MAINTENANCE OF CANTEEN; Consumables to be provided by service provider (inclusive in contract cost)
Toner Cartridges/Ink Cartridges/Consumablesfor Printers (Q2)
High Mask at Ward No.26 New Market Colony Ground
Construction of Retainning wall ward no. 40
Construction of Boundary Wall at Sector No.2 Ward No.32
Construction of precast on drain at ward no.13
Construction of Ramp at Murtivisarjan Sthal Ward No.43
Maintenance and Painting work of H-19 Nagar Nigam Colony bilaunji ward no.42
Construction of culvert at ward no.24
Waterproofing Treatment Works for TG Building Roof of Stage II at NTPC Singrauli STPS
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra TUV300, Mahindra Bolero, or Equivalent as per requirement of department; The vehicle to be deployed should not be more than three years old from the date of its first RTO regist.., Monthly Basis Cab and Taxi Hiring Service - Without Fuel - MUV; Mahindra Imperio, Tata Xenon Yodha, Mahindra Bolero Camper, or requirement of department; The vehicle to be deployed should not be more than three years old from the date of its first RT..
Spares for Sump Pump
Facility Management Services - LumpSum Based - Industrial; O&M of Mechanical Work; Consumables to be provided by service provider (inclusive in contract cost)
Aluminium Conductors For Overhead Transmission Purposes (V2) Conforming To IS 398 (Q3)
Filter Paper for Chemistry Laboratory
SPROCKET ASSY-PART NO.TA6523, SPROCKET SEGMENT- PART NO.TS1332, SEAL GROUP-PART NO.TA4258, FELT STRIP-PART NO.TA1574, FELT STRIP-PART NO.TA4132, SEAL GROUP-PART NO.TA4255, APRON FEEDER PLUMBER BLOCK ASSY FOR COU-PART NO.TA4259, PLUMBER BLOCK ASSEMBLY-PART NO.TA4257
Procurement of Secondary sizer spares for CHP
Astronomical Timer for Street Light Control (Timer Controls) as per IS 9000 (Q3) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete
Fabrication of 24 nos 4 sets rocker arm of Hoist Drag motor 1300 HP of 24 96 dragline
Repairing of Godrej make Forklifter Model GX500D Sl. No. 61581 and 61588 working at Block-B Project
Facility Management Services - LumpSum Based - Residential; Housekeeping; Consumables to be provided by service provider (inclusive in contract cost)
Procurement of Bucket Spares of 33/72 Dragline
Bulk Procurement of the Instrumentation Cables
Facility Management Services - LumpSum Based - Industrial; Operation of fire fighting at coal stock yard on daily basis for 365 days at Nigahi Project; Consumables to be provided by service provider (inclusive in contract cost)
Three Phase Secondary Injection Relay testing instrument
RCC drain pappu chauraha to navdurga school at ward 14
Indent of Mobrey (Solartron) make spares for Hydrastep at VSTPP STAGE 2