Loading…
Loading…
Found 122 active tenders
122 results • Latest
Construction of Student Centre in Degree College Paonta Sahib Distt Sirmour HP
Sub-Head : Earth Work
Periodical renewal on Lawassa Chowki Preet Nagar road Km 34/0 to 41/0 (SH- Providing WBM G-III, Bituminous concrete 25 mm thick, Bituminous Macadam 50 mm thick and thermoplastic compounds etc.)
Providing Laying,spreading and compacting stone aggregate of specific sizes to water bound macadam specifcation including spreading in uniform thickness, hand packing rolling with 3-wheeled static roller 8-10 tonnes in stages to proper grade and camber applying and brooming crushable screening/ binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per techical specification clause 405 . W B M Grade-III 53 mm to 22.4 mm size with all leads and lift and as per the direction of Engineer -in-Charge
Periodical renewal on Dhamkari Ki Johri Bagthan road Km 0/0 to 3/00 and Banad Bohal Gagal Shikore road Km 0/0 to 2/0 (SH- Providing WBM G-III, Bituminous concrete 25 mm thick, Bituminous Macadam 50 mm thick and thermoplastic compounds etc.)
Providing Laying,spreading and compacting stone aggregate of specific sizes to water bound macadam specifcation including spreading in uniform thickness, hand packing rolling with 3-wheeled static roller 8-10 tonnes in stages to proper grade and camber applying and brooming crushable screening/ binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per techical specification clause 405 . W B M Grade-III 53 mm to 22.4 mm size with all leads and lift and as per the direction of Engineer -in-Charge
C/O Nahan-Dadahu-Haripurdhar Road portion from Dam Project to Sainj (RD 41/900 TO 71/915) under HPPWD, Division Sangrah Distt. Sirmour H.P. (Sub Head Preparation of FCA case and Digital Map C/O Nahan-Dadahu-Haripurdhar Road portion from Dam Pr
Preparation and processing of FCA case and Digital Map of the Project with collection of data from site as per FCA guidelines with G.P.S. Coordinates. CA Site with preparation of the proposal folder of Project as per the Guidelines of MoEF with online uploading data on MoEF Portal and monitoring of the Proposal till final approval.
R/R damages on office building of Executive Engineer Sangrah Division HP.PWD., Sangrah (SH Providing and installation of 40 KVA Auto D.G. Set).
Supply and fixing of 40 KVA KIRLOSKAR (KOEL Green),Cummins, Mahindra Powerol, Honda, TATA LIQUIED COOLED/AIR COOLED SILENT DG SET comprising of company make LIQUIED cooled Diesel Engine model NORMS COMPLAINCE) developing 56 BHP @ 1500 RPM & 40KVA same company Greem make alternator rated at 3 Phase 415 Volts 50Hz 0.8 p.f.@1500 RPM both mounted and aligned on a common MS base frame complete with MS fuel tank,standred AUTO control pannel Residential Exaust Silencer AVM pads fitted on the base frame, 1Nos 12 Volts DC Battery leads,Ist fill lube oil, all housed in sound proof Acoustic Enclosure complete in all respect. All Accessories and erection charges shall be included.* Superior looks,New Attractive Color Scheme,Multicolour Genset status Indicator,Silencer Inside Conopy with compact design & Auto start Auto stop (Type A Panel) ( The Rate is including 18% GST.)
R/R Damages on various road under Gattadhar Section, HPPWD Sub- Division Haripurdhar (SH Hiring of JCB for removal of snow and Slip)
Hiring of excavator-cum-loader for removal of land slide, slip clearance including cutting and trimming of slops and disposal of cut materials of all kinds of soil with minimum capacity 18 to 25.00 cum/ per hour & minimum 6 hours per day including services of operating staff as required including full time chowkidar for guarding the machine, POL charges & maintenance. Any loss or damage causes to machinary during transit or at site of work shall be borne by the contractor at his own cost. Any type of damage to private and Govt. property is the whole rsponsibility of the contractor. No breakdown will be included in hire charges due to any kind of hinderance.The work shall be executed as per the HP.PWD specifications within all leads,lifts and carriage of materials as per the entire satisfaction & direction of the Engineer-in-charge.