Loading
Loading…
Loading…
1,091 results • Recent activity
Desilting /Excavation and Internal clearance of Ghaggar Baruwali Link Channel from RD 0 to 36500 tail(unlined) in Jhanda section.(For Kharif Season 2026)
Internal outer and silt clearance of NGC (Unlined) from RD 0 to 43650 in Ottu Section.(For Kharif Season 2026)
Internal/outer and silt clearance of NGC (Unlined) ate forfrom RD 43650 to 53160 and Nakora Minor RD 0 to 9500 Tail and Chichal Minor RD 0-22380 Tail in Nakora section.(For Kharif Season 2026)
Widening and Strengthening of Road
Construction of Public Toilet in M.C. Rania Under Swachh Bharat Mission SBM-U 2.0
Repairing of damaged watercourse crossing at RD. 12500 and RD. 35500 of Sadewa Parallel Channel