Loading…
Loading…
74 results • Latest
First class brick lining work with 100pct. new brick and all required work at Nandi main canal including all cost of material, labour, tool and plant etc. All work should be done as per drawing and BOQat Nandi pump canal in district Amethi.
First class brick lining work with100pct new brick from along with local sand filling, brick ballast and CCwork in canal bed with glass strip with all cost of material, labour tool and plant etc. as per drawing and BOQat Kuchali P/c Dist. Sitapur
First class brick lining work with new brick along with local sand filliing in bed and CC work in canal bed with Glass Strip with all cost of material labour tool and plant etc. as per drawing and BOQ at Kuchalai pump canal in district Sitapur.
LT Outdoor Distribution Feeder Panel (Type A-1), LT Outdoor Distribution Feeder Panel (Type B-2), LT Outdoor Distribution Feeder Panel (Type B-3), LT Outdoor Distribution Feeder Panel (C-Type), LT Outdoor Distribution Feeder Panel (Type B-1)
62/EDCS/2026-27
SETTING UP OF CBG PLANT AT MAHOLI CAMPING GROUND AT SITAPUR UTTAR PRADESH. TENDER IS BEING UPLOADED FOR BIDDING OF IOCL, BPCL, HPCL ONGC, GAIL, OIL AND NDDB ONLY.
Annual percentage rate contract (ARC) for Civil and allied works at New and Old Campus CDRI, Sitapur Road, Lucknow during 2026-27.
Development/upgradation of existing 4 lane to 6 lane of Lucknow Sitapur section km 412.745 to km 479.327 (Length 66.582 km) of new NH30 in the State of Uttar Pradesh on BOT (Toll) Mode
57/EDCS/2026-27
26/EDCS/2026-27