Loading…
Loading…
378 results • Latest
Completing canal section from km 9.750 to Km 9.783 of RPBC
Completing canal section from km 9.680 to Km 9.713 of RPBC
Completing canal section from km 9.600 to Km 9.631 of RPBC
Offloading work for Demounting and Mounting of Assemblies alongwith Repairing of mounting bores by coaxial line boring in 21 nos KOMATSU HD785 7 100Te Dumpers of Dudhichua Project
Offloading work for Repairing and Servicing of Airconditioning Units installed in Operator and Crew Cabins of 04 nos 24 96 Draglines of Dudhichua Project
PROCUREMENT OF AXIAL PISTON PUMP FOR CHP III NTPC RIHAND
Cassette Baffle for Primary Super heater coil, Cassette Baffle for ECO upper coil, Cassette Baffle for ECO lower coil
Cuplock ledger 2000mm long, BSL Steel Scaffold Board in single length, 57 mm deep, 2450x250 mm, Omega Transom 2.0 m, Omega Hop-up Cuplock, Omega Transom 2500 mm
Flash Butt Welded Endless Chain, Padlock Type chain connector
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Anpara Thermal Power Plant; Overhauling works of various parts of Bowl Mills XRP 803 during overhauling of Unit no 2; Service Provider