Loading…
Loading…
3,603 results • Latest
Handling and Transport on Lumpsum Basis - Transportation of Fly ash from silo of NTPC Singrauli to the abandoned pit of Gorbi mine of NCL
Bulk Procurement of Air Conditioner 1.5T Window type
Flight bar with attachment bracket, ATTACHMENT BRACKET (FOR FLIGHT BAR)
Power supply arrangement for Annual Safety Week final Day function at DAV ground.
Monthly Basis Cab & Taxi Hiring Services - SUV; 2500 km x 320 hours; Local 24*7
Monthly Basis Cab & Taxi Hiring Services - SUV; 2500 km x 320 hours; Local 24*7
C O OFFICE BUILDING FOR KSHETRADHIKARI GHORAWAL IN DISTRICT SONBHADRA
Monthly Basis Cab & Taxi Hiring Services - SUV; 2500 km x 320 hours; Local 24*7
Monthly Basis Cab & Taxi Hiring Services - SUV; 2500 km x 320 hours; Local 24*7
Custom Bid for Services - ---- Similar Category Energy Audit Service - Lumpsum Based
Monthly Basis Cab & Taxi Hiring Services - SUV; 2500 km x 320 hours; Local 24*7
Murdhawa Myorpur Babhani Chpaki Bijpur Pramukh jila marg no 168E (Chainage 49.00 to 69.170) par KM 50 se 56 tak ke patch marammat BC ka karya.
Repairing of vehicles UP64AT9983, UP64T7153, UP64AT7209, UP64T7278, UP64AT6525 and UP64AT7502 of Khadia Project.
Repairing of Injector assembly of Mahindra Scorpio S10 REG No. UP64 AB 4288 of Kakri Project
Erection and dismantling of HTOH/line in the mines for Power supply to HEMM and associated equipment as and when required basis in the mines area for one year of Kakri project.
ECCENTRIC BUSH 5, Part No. 4107013704, ECCENTRIC BUSH 4, Part No. 4107013709, PIN 4 TRUNNION LINK, Part No. 4107013754, PIN 5 TRUNNION BRACKET, Part No. 4107013758, WEDGE SUIT 70 MM ROPE, Part No. 4107013783, PIN 5 DRAG SHACKLE, Part No. 4107013785, PIN 4 DUMP SOCKET, Part No. 4107013792, PIN 4 DUMP BLOCK, Part No. 4107013811, MEGALOCK DUMP BLOCK PIN, Part No. 4107013812, PIN 5 HOIST SOCKET, Part No. 4107013817, PIN 4 HOIST CLEVIS LINK LOWER, Part No. 4107013820, PIN 4 SPREADER BAR, Part No. 4107013824
Erection and dismantling of LT OH/line for illumination in mine and dumping area as and when required basis for one year at Kakri Project.
Bearing 189
SWAS SYSTEM
Operation and Maintenance Power House/Power Plant - Biennial M and R of misc civil works of A B D power houses
G.P. SEHUWA ME GODAM SE HANUMAN JI KE MANDIR TAK SAMPARK MARGE KA NIRMAN
Vikas khand kon me Raji sampark marg ke ragram shiv mandir se prathmik vidyalaya ragram tak lagbhag 02 KM pakke marg ka nirmad karya.
Procurement of spare parts of IKA Bomb Calorimeter at NTPC Singrauli
V.K. Kone ke gram P kone Shiv shankar Gupta ke ghar se santosh jaiswal ke ghar tak sampark marge ka nirman
Toshniwal make Oval wheel meter Model no. OI50Ag 19E/G2, Pressure: 16 barflow rate: 30-300 LPM
Dismantling, laying and repairing of 10 inches or 12 inches pipelines for dewatering of the mine water during the Monsoon at Kakri Project.
PAKAGE NO UP 67135 PATWADH SE BASUHARI SAMPARK MARGE CHANAGE 0.00 TO 61.500 TAK KE CHAURIKARAN AND SUDRIKARAN HETU VAN VIBHAGE SE PRABHAWIT 45.295 HE VAN BHUMI KE BADLE 7 PAICHO ME UPLABDH KARAI GAI GAIR VAN BHUMI ASTHAL KI FENSING , SOLAR P,BORV
SUPPLY OF HANGER SUPPORT -SINGRAULI
Estradiol Valarate 1mg Tab Brand Name - Estrabet-1 , Mfg by - Swiss Garnier Life Sciences (P) Ltd.
SODIUM VALPROATE 40 MG PER ML ORAL SOLUTION 200 ML
Diazepam 5mg per ml Inj Brand Name - Inj. Calmpose 2 ml , Mfg by - Sum Pharma Lab. Ltd.
different types of electrical items
Monthly Basis Cab & Taxi Hiring Services - SUV; 2500 km x 320 hours; Local 24*7
Guided wave Radar level transmitter for Hotwell level Measurement and auto control., Mass Flow Meter Fuel LDO Flow Transmitter
Finger Contact Clamp Porcelain Insulators for OLTC of UAT and ST Transformers of following Size:- ID- 32mm, OD- 54 mm, Depth - 5 mm, Collar- 3 mm hollow. It should withstand High Voltage 5 KV (rms) for 1 minutes and should have creepage >744. (As per Sample provided by user division), Electronic Timer (01-100) for UAT (As per Sample provided by user division), Electronic Timer Contact for GT (As per Sample provided by user division), Overload Relay, LRD -08, Range 2.5-4.0A (As per Sample provided by user division), 18 AMP CONTACTOR SIEMENS 3TF3110-0AP0 (As per Sample provided by user division), O-type Cable Lugs of 2.5 mm with Ferule (4mm) (As per Sample provided by user division), NS type HRC Fuse 06 Amp (As per Sample provided by user division), NS type HRC Fuse 10 Amp (As per Sample provided by user division), NS type HRC Fuse 16 Amp (As per Sample provided by user division), TIA type HRC Fuse 25 Amp (As per Sample provided by user division), TIA type HRC Fuse 32 Amp (As per Sample provided by user division), TIA type HRC Fuse 63 Amp (As per Sample provided by user division)
spares of auxiliary pump
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Routine maintenance of PA system and Digital EPABX System and Preventive and breakdown maintenance of EOT crane Battery system DCDB DG Sets Compressor panels and RV Exh..
Biennial Service Contract for Rihand Stage 2 2X500 MW Bently Nevada MainTurbine TSI system for 2026 2028
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Thermal Power Plant; Testing of HT Vacuum Bottle; Service Provider
Custom Bid for Services - Complete overhauling of electrical system of soot blowers and motor feeder modules Similar Category MULTI-PROTOCOL LABEL SWITCHING SERVICE(MPLS SERVICE)
Construction work for the Government Ashram Paddhati School (Girls), Kuldomari, District Sonbhadra
LED Rope Light (LED Strip Light) Conforming To IS 10322 (Part 5/Section 9) (Under BIS Scheme - II) (Q3) (3 (3 ))
CONSTRUCTION OF PLATFORM AND G.I. CHAIN LINK FENCING FOR STATIC CRYOVESSEL AT PASHU CHIKITSALAYA RABARTGANJ, DISTT. SONBHADRA, (U. P.)
ABT ENERGY METER Specification: 1. Model no. - APEX- 150.2. Configurable pulse/O: 4, Pulse O/O: 3.
Cleaning and boulders breaking work of ACHP
M4745016022_ BURNER COAL NOZZLE TIPS FOR STAGE-1
Moderate Heat Duty Fireclay Refractories, Group A as per IS 6 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
ASSEMBLY RACK FOR MAIN STEAM PRESSURE INSTRUMENTS-IR01 (Mat. Code: ST9618131130), ASSEMBLY RACK FOR MAIN STEAM PRESSURE INSTRUMENTS-IR02 (Mat. Code: ST9618131149), ASSEMBLY RACK FOR CONDENSER PRESSURE INSTRUMENTS-IR03 (Mat. Code: ST9618131157), ASSEMBLY RACK FOR CONDENSER PRESSURE INSTRUMENTS-IR04 (Mat. Code: ST9618131165), ASSEMBLY RACK FOR EXTRACTION & GLAND STEAM PRESSURE INSTRUMENTS-IR05 (Mat. code W90318131170), ASSEMBLY RACK FOR EXTRACTION & GLAND STEAM PRESSURE INSTRUMENTS-IR06 (Mat. code W90318131188), ASSEMBLY RACK FOR HRH/MS PRESSURE INSTRUMENTS- IR07 (Mat. Code: ST9618131190), ASSEMBLY RACK FOR HRH/MS PRESSURE INSTRUMENTS-IR08 (Mat. Code: ST9618131203), ASSEMBLY RACK FOR WATER INJECTION INSTRUMENTS-IR09 (Mat. Code: W90318131218), ASSEMBLY RACK FOR WATER INJECTION INSTRUMENTS-IR10 (Mat. Code: W90318131226), COMMISSIONING SPARES FOR FITTINGS IN INSTRUMENT RACKS (Mat. Code: W99318130112), MANDATORY SPARES FOR FITTINGS IN INSTRUMENT RACKS (Mat. Code: ST9613813012)
Dredging work in Overflow Lagoon at NTPC Rihand for the year 2026-27.
Regulated Secondary pressure 0 to 7 kg/cm2 with pressure gauge range 7 kg/cm2 Make: IMI Norgren, Micro fog lubricator (L72M-2GP-QTN) (L72M2GP-QTN) Make: IMI Norgren, Pure Air high efficiency oil removal filter (F64C-2) Make: IMI Norgren, Compressed Air Filter Make: IMI Norgren, Air Filter with Manual Drain Make: IMI Norgren, Electro Pneumatic Converter Input 4-20 mA, Output 0.2 -1.0 kg/cm2 Make: IMI Norgren