Loading…
Loading…
3,000 results • Recent activity
Light Diesel Oil-IS: 15770 (Q2)
Repair minor maintenance of complete Electrical system at AWRS ETP, Removal Reinstallation Replacement of 0.4 KV, 160 to 200 KW motors, 130 KW motors, 30 KW motors, Removal Re-installation Replacement of 0.4 KV, 0.7KW to 5.5 KW motors, Servicing maintenance of Bearings testing of 0.4 KV 130 KW motors, Servicing maintenance of Bearings testing of 0.4 KV 130KW upto 200 KWl motors, Servicing maintenance of Bearings testing of 0.4 KV 375 KW motors, Servicing maintenance of Bearings testing of 0.4 KV 30 KW motors, Servicing maintenance of Bearings testing of 0.4 KV 0.7KW to 5.5 KW motors, Servicing maintenance testing of modules of motors incomer section up to 200 KW, laying of L.T power cable 3C x 26 to 240 mm2 3.5C x 25 to 185 mm2, aying of L.T power cable 1C x 1000 mm2 2C x 400 mm2, End termination of power cable 3C x 26 to 240 mm2 3.5C x 25 to 185 mm2, End termination of power cable 1C x1000 mm2 2C x 400 mm2, OH cleaning Reconditioning 200AH- 600AH Batteries 350V-360V DC, Load test for various size battery of UPS, OH of Bus bars tightness checking and replacement of damaged switches, Cleaning and painting of the wooden battery stands of UPS, AMC of Air Conditioners repairing and servicing, Gas Charging Work of AC, Rewinding of burnt fan motor of Air Conditioners, Repairing of actuators of Nozzle valves, Repairing of Flame scanner system, Repairing of HEA system, Repairing of Solenoids of HAG, Repairing of actuators HAD and CAD, Repairing servicing and installation at site of Atomizing steam nozzle valve
General Repair and Renewal with PC of R G road Km 7 to Right side Bagthari Primary school and Primary helth center in revnue village Bhagthari Via Shahganj Rajwaha Link Road
General Repair and Renewal with PC of Bhagalpur to Budharkhurd Via Manpur Link Road
Insulation Tester (Q3), Digital Multimeter (Q3), true rms clamp meter (Q3)
Spares of Voith Turbo make Hydraulic Coupling