Loading…
Loading…
122 results • Latest
Development work in Sant Kabir Chaupal, MC Kharkhoda.
Rate Analysis For Earth work in filling in street and resembling work. 1. These rates are exclusive of GST, contractor`s profit and overhead charges. 2. Carriage for 5.0 km lead by Mechanical Transport including loading, Unloading and stacking. These rates are exclusive of Contractor`s profit and over heads as well as GST 3.1 By Mechanical Transport including loading, unloading and stacking (Lead Beyond 5 and up to 15 KM) 23X0.893=21/- Unit rate of Earth filling in street and resembling work= 197/- Per Cum (With out G.S.T.)
VARIOUS WORKS FOR IEC ACTIVITY UNDER SBM SCHEME IN MC GANAUR
WALL PAINTING WITH MURALS/GRAFFIITTEE
Khanpur Kalan- Annual Mtc. W/S Scheme Khanpur Kalan -Repair of pump chamber, boundary wall and const. of path at boosting station in Village Khanpur Kalan Tehsil Gohana Distt. Sonipat and all other works contingent thereto
Writing of Slogan with painting complete in all respect
Providing Special Repair to EI and Street Lighting in the campus of Govt. ITI Butana in District Sonipat
Providing Special Repair to EI and Street Lighting in the campus of Govt. ITI Butana in District Sonipat
Pdg. Rewiring and Street Lighting in Residential Quarters located in the campus of Sub Divisional Agriculture Office, Gohana District Sonipat
Pdg. Rewiring and Street Lighting in Residential Quarters located in the campus of Sub Divisional Agriculture Office, Gohana
Protection of abadi area HDPE pipeline Shree shyam pond to try drain No. 3
(NS)Providing, lowering, laying, aligning, fixing in position and jointing at all level/ depths ISI marked HDPE pipe of PE-80 grade and PN- 4 for supply of flood water as per IS 4984-2016 (amended up to date) in trenches in complete including cost of HDPE Specials, labour, sectional hydro testing (including the cost and conveyance of water to site for testing) and commissioning as per Technical Specifications and as per direction of Engineer. Note: E/w to be measured and paid separately. Rate includes cost of all specials like bends, tees required during laying of pipe line along required alignment 355 mm Outside Dia