Loading…
Loading…
318 results • Latest
Construction of Bridge in Sonitpur district i) Br. No. 1/1 on Bhakatgaon (Khalihamari) to Buragaon Road Package No. CE/EAP/ARRBP/OCB/Bridge-1/Sonitpur/26
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150mm in thickness as per Technical Specification Clause 201. By Mechnaical means In area of non-thorny jungle i) Bridge No 1/1 of Bhakatgaon (Khalihamari) to Buragaon Road
Pneumatic Tyres for Commercial Vehicles - Diagonal and Radial Ply Marked to IS 15636 (Q2) (3 (3 ))
Pneumatic Tyres for Commercial Vehicles - Diagonal and Radial Ply Marked to IS 15636 (Q2) (3 (3 ))
Repair and Overhauling Service - POWER DRIVEN SAW COMPLETE WITH TWO SPARE BLADE; POWER DRIVEN SAW COMPLETE WITH TWO SPARE BLADE; Yes; Buyer Premises, Service Provider Premises
Repair and Overhauling Service - POWER DRIVEN SAW COMPLETE WITH TWO SPARE BLADE; POWER DRIVEN SAW COMPLETE WITH TWO SPARE BLADE; Yes; Buyer Premises
Interactive Panels with CPU (Q2), PTZ Camera, Host Unit, Delegate Units, Audio Mgt, Charging Unit, Mixing Amplifier, Handheld, DSP, Speaker, Rack, Assy 1, Assy 2
IT Conference Setup
PROVN OF CERTAIN SANCTIONED WKS AT AF STN MISSAMARI UNDER GE MISSAMARI
Excavating in post holes (or similar holes) in soft/loose soil, each n exc 0.5 cu. m, getting out,and removing soil out of the site ,complete all as specified and as directed.
REPAIR TO FLOORING OF TOILETS, KITCHENS, ROOMS AND CHANGE OF DOORS IN CERTAIN QTRS IN DOMESTIC AREA AT AF STN TEZPUR UNDER GE (AF) TEZPUR
M & L for non skid ceramic (coloured), 7 to 8 mm thick as in floor area of each tile exceeding 0.6 Sqm but n exceeding 0 .11 Sqm , set and jointed in neat cement slurry and pointed in white or colored cement to match incl and over screed bed or beeding layers of mortar 15mm thick in CM 1:4 in floors, including dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing) including removing the rubbish off the premises, complete all as specified and directed.