Loading…
Loading…
3,651 results • Recent activity
SITC Of LED Signage Board, Supply and fixing of CI Housing box, Supply of CI Housing box, Supply of Isolating Transformer, Supply of 1C x 6 Sq.mm Cable, Supply of secondary lead, Supply of plug and receptacle, Supply of SS Bolt, Supply and fixing of base plate, Supply of base plate, Supply of 3c x 4 Sq.mm armoured cable, Supply of 50mm dia GI pipe, Supply of CCR Spare, Supply of HT Tape, Supply of gasket, ITC of isolating transformer, Supply and laying of HDPE pipe, Laying of cable, GI Pipe earthing, Supply and laying of SWG wire, Painting of taxi fittings, Excavation of soft soil
INTEGRATED SECURITY SURVEILLANCE SYSTEM SERVICE - Theft Prevention, Remote Video Monitoring, Facility/Asset Protection, Monitor Operations, Employee Safety, Parking Lots, Public Safety, Outdoor Perimeter Security, Visitor Management; Recording Device..
Custom Bid for Services - UPGRADATION OF BARBER ROOM AT BASE VICTUALLING YARD (SVP) Similar Category Repair, Maintenance and Installation of Plant Systems/Equipments
Central Venous Catheters (V2) (Q2) (3 (3 ))
Repair and Overhauling Service - INDUSTRIAL HEAVY DUTY COMPACTORS; NA; Yes; Buyer Premises
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - C 146; H003 Following defects observed in ships Gemini 01 in no crack observed in ships Gemini Keel Bottom Water ingress observed in Gemini during operations Cracks to .., and Installation of Plant/Systems/Equipments (Version 2) - C 146; H004 galley RO plant not getting started suspect pump nonops and filters choke outer and inner to be replaced as per sample and system to be proved for satisfacto.., and Installation of Plant Systems/Equipments (Version 2) - C 146; H005 Both main engine shaft protection cover to be fabricated in engine room and silencer battery compartment Material Aluminum with supportive angler and clamps .., and Installation of Plant/Systems/Equipments (Version 2) - C 146; H006 04 in nos commode of officers toilet EPs toilet deteriorated to be replaced as per sample Mat Porcelain Plastic Qty04 Nos; Service Provider, and Installation of Plant/Systems/Equipments (Version 2) - C 146; H007 Canvas covers of following equipment items have been torn damaged are to be stitched as per sample alongwith Velcro Radar antenna 02 Nos Flag Locker 02 Nos D.., and Installation of Plant Systems/Equipments (Version 2) - C 146; H008 02 in no water jet guard cover of inspection window uprooted due to rough sea higher sea state and bad weather Approx area 2X2 feet same to be replaced renew.., and Installation of Plant/Systems/Equipments (Version 2) - C 146; E02 Following defects observed on Diesel Driven Pump Pump dropping suction frequently Abnormal sound observed in pump Pump foundation Diesel driven pump not devel..