Loading…
Loading…
3,645 results • Latest
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Aux Barge Urja Sanchay; H065 01 in no split AC Make blue star model Bo3hw18vcu capacity 1 5 ltr not producing cooling effect view oil leakage and abnormal noise from co.., and Installation of Plant/Systems/Equipments (Version 2) - Aux Barge Urja Sanchay; H066 Bridge chair uprooted and deteriorated from base and mechanism for seat tilt tension control seat tilt adjuster not working Defect to be rec.., and Installation of Plant Systems/Equipments (Version 2) - Aux Barge Urja Sanchay; H067 Fabrication of 01 no rod rail at bridge for supporting of QM during at sea while operating steering gear wheel Rod rail to be fabricated and..
REPLACEMENT OF VINYL FLOORING IN 03 EXISTING OFFICE AND BACK REST COVERS OF EXISTING OFFICE CHAIRS
Security Manpower Service (Version 2.0) - Office/Commercial/Institutions/Residential; Watch and Ward
REPLACEMENT OF FLOOR MATS IN 04 EXISTING OFFICE AT CGAE (SVP)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - ICGS Rajdhwaj; L-109 & L- 110; Service Provider
DESIGN, PRINTING, FABRICATION AND REFURBISHMENT OF OFFICE SIGNAGE, NAME TALLIES AND ALLIED DISPLAY I