Loading…
Loading…
3,737 results • Latest
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - ICGS C-428; E012 During sea and action checks it was observed that Low Coolant Level alarm observed on SME During DI DR it was observed that coolant leakage from ME B ba..
PAINT NON SLIP EPOXY D A GREY WITH HARDNER, PAINT EPOXY ALUMINIUM PRIMER (ANTI CORR EPOXY RESIN BASE), PAINT RFU ENAMEL INTERIOR SIGNAL RED, INTERTHANE 900 PINE GREEN RAL 6028, PAINT RFU BITUMINOUS BLACK ACID ALKALI+ HEAT RESISTING
Digital Film Thickness Gauge
Repair and serviceability checks of gas pipeline
High End Desktop Computer (Q2) (3 (3 ))
Construction of 01 No. Physics Lab, 01 No. Chemistry Lab and 01 No. Biology at Govt. Senior Secondary School, Bathu Basthi under Samagra Shiksha.