Loading…
Loading…
3,739 results • Latest
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Office Space; E-102 Defcet rectification of E 102 AC plant system; Service Provider
Tentage Service Lumpsum Based - Exhibitions; Floorings, Lighting, Tent Rentals, Theme Based Installation, Decoration, Furniture & Equipment Rentals, Power Supply, Logistics & Delivery, Maintenance & Support, Safety Measures, Dismantling and Removal, ..
Tentage Service Lumpsum Based - Exhibitions; Floorings, Lighting, Tent Rentals, Theme Based Installation, Decoration, Furniture & Equipment Rentals, Power Supply, Logistics & Delivery, Maintenance & Support, Safety Measures, Dismantling and Removal, ..
Pencil Battery Small, Add Gel Pen Red, U Pin, Sketch Pen, 1 And Half Inch Cello Tape Transparent, Pen Pillot Hi Tech Black 0.5, Dusting Cloth Yellow color good quality, Fevicol 200gm, 1 And Half Inch Cello Tape Blue and Red, Stick Note Yellow 75 x 75 mm, Self Adhesive Flag, Short Hand Notebook Good Make Note Pad, Room Freshner, Carridge 664, Hit Spray 500 ml, Pencil Battery, Eraser, Add Gel Pen Green, Add Gel Pen Black, Marker Black and Blue, Add Gel Pen Blue, Glue Strick, Correction Fluid Pen, Pen Pilot V7 Blue, File Binder, Binder Clip Small, Binder Clip Medium, Pencil 2B 6B and 4B Black Colour Each, Dak Folder, DVD RW Blank, CD RW Blank, CD RW Blank with Cover, Inkjet Cartridge SP200, HP Ink tank 316 Colour Printer, HP Ink tank 316 AII Colour, Transparent Tape 1 and Half inch, Transparent Tape 2 inch, Brown Tape 2.5 Inch, Stamp Pad Ink, Pen Blue, Calling Bell, A3 Paper, Calculator Big, Umbrella, Wall Clock Bid Number : GEM/2026/B/7092450 Dated : 19-01-2026 Bid Document 1/35
Automatic Fire Ball for Fire - Extinguishing (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6881969 Dated : 26-12-2025 Bid Document 1/7, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 127865 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 3.00 ( ) Duration of ePBG required (Months). 14 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : 2/7 THE PRESIDENT OF INDIA CDA IDS NEW DELHI (President)
A/R and M/O Other District Road under RCD, APWD, Wimberly Gunj during 2025-26. S.W Construction of CC drain and Shoulder protection near Kabristan Masjid at Nayapuram under RCD, APWD, Wimberly Gunj.