Loading…
Loading…
595 live269 closing this weekmost from National Highways Authority of India and Department Of Military Affairs
595 results • Latest
Development of a Link/Connector Corridor connecting the NH 31 and Varanasi Ring Road along the River Varuna for Decongestion of Varanasi City PKG 1 from Km 0.000 to Km 11.744 (TL 28.498 Km including MCW/Flyover/Loop/Ramp/Link Road) in UP on HAM.
Construction of 6 Lane Road Tunnel for NH 148AE connecting Dwarka Expressway NH 248BB with Nelson Mandela Marg Vasant Kunj in the State of Delhi on HAM mode
Development of Link Connector Corridor between NH-19 and Varanasi Ring Road with Riverbank Connectivity along River Ganga for Decongestion of Varanasi City PKG2 from Km7.926-Km18.560 (TL 26.039Km MCW FOB Loop Ramp) in UP on HAM
Development of Link Connector Corridor between NH-19 and Varanasi Ring Road with Riverbank Connectivity along River Ganga for Decongestion of Varanasi City Pkg 1 from Km 0.000-Km7.926 (TL 20.00Km MCW Loop Ramp Link Road) in UP on HAM
Construction of Perimeter Roads on Both sides of Emergency Landing Facilities (ELF) including ATC Plinth (50m x 50m) on Chilakaluripeta Nellore Section of NH16 from Km. 1210.000 to Km. 1214.600 in Andhra Pradesh on EPC Mode
Widening and Upgradation of existing highway from Khagaria (Design Ch. 270.000) to Purnea (Design Ch. 413.529) section of NH 31 and NH 231 to 4 lane with paved shoulders under NH (O) on BOT (Toll) in the State of Bihar (2 nd call)
IE Services for (PKG-2) Cons.of 6L access controlled greenfield highway from Ahilyanagar (km 290.000) to Hasapur (km 512.000) in the State of Maharashtra on BOT (Toll) Mode 2nd call
IE for (PKG1) Dev of 6L access controlled greenfield highway starting from Junction with NH-60 at Adgaon (km. 138.00) to Ahilyanagar (km. 290.000) to start of Ahilyanagar bypass (km. 126.564) of NH-160 in Maharashtra on BOT (Toll) Mode 2nd call
Request For Proposal (RFP) for Design Supply Installation Testing Commissioning and Operation and Maintenance of Advanced Traffic Management System (ATMS) projects in Bangalore Vijayawada Economic Corridor (BVEC) on EPC mode
Consultancy Services for preparation of Detailed Project Report (DPR) for Four laning of TN/KL Border Thondi section (Tentative Length 225 Km) of NH 85 in Tamil Nadu (2nd Call)
CONSTRUCTION OF 4 LANE THIRUVANANTHAPURAM OUTER RING ROAD (ORR) FROM NAVAIKULAM (CH. 0.000) TO VIZHINJAM (CH. 62.700) SECTION OF NH 866 DESIGN LENGTH 62.7 KM IN KERALA ON BOT MODE
Supply and AMC of Drones for Transmission Line Patrolling
Construction of 6 lane Viaduct and service road from Baikampady (Km.365.200) to KIOCL junction (Km.368.275) of NH-66 in the state of Karnataka on EPC mode
Request For Proposal (RFP) for Design Supply Installation Testing Commissioning and Operation and Maintenance of Advanced Traffic Management System (ATMS) projects in Zone 1 (Delhi Region) on EPC mode
Develop. of 6L AC GF Regional Expressway on Northern side of Hyderabad from Pragnapur Vill Design Ch82.000 to Tangad Palle Vill Design Ch160.000 for a Design L of 78.000 Km in the State of Telangana under NH(O) on HAM PKGII
Devel. of 6L AC GF Regional Expressway on Northern side of Hyderabad from Girmapur Vill Ch1.518 to Pragnapur Ch.82.000 for a Design Length of 83.518 Km in Telangana under NH O on Hybrid Annuity Mode PKG I
Construction and Upgradation of existing 2L.PS to 4L with Paved Shoulder configuration from Km 0.000 (Tansen Chowk Purani Chhawani Gwalior) to Km 77.000 (Near Village Prithvipur) of NH719 in Madhya Pradesh on Hybrid Annuity Mode (Package1).
Construction and Upgradation of existing 2L.PS to 4L with Paved Shoulder configuration from Km 77.000 (Near Village Prithvipur) to Km 116.200 (MP/UP Border near Village Barahi) of NH-719 in Madhya Pradesh on Hybrid Annuity Mode (Package2).
Consultancy Services for preparation of DPR /Feasibility Report for new Mumbai-Pune greenfield expressway in the State of Maharashtra (Approx. Length 130 km)
Develop of 6L access controlled greenfield highway starting from Junction with NH60 at Adgaon km. 138.00 to Ahilyanagar km. 290.000 (Ahilyanagar Bypass pkg I)
Construction of 6L access controlled greenfield highway from Ahilyanagar km 290.000 to Hasapur km 512.000 (AHILYANAGAR BYPASS PKG 2)
Rectification of Black Spot locations of Chutupallu Ghati from Ch. 92.885 to Ch.97.920 and Charahi Ghati Section from Ch. 51.540 to Ch. 52.500 on NH33 (New NH20) under NH(O) on EPC mode in the State of Jharkhand
Six laning of Atkadih to Gorhar Section of NH 19 (Old NH 2) from Km 320.800 to km 326.160 in the State of Jharkhand on EPC Mode
CS for IE for the Dev. of 4/6L of access controlled Kanpur Kabrai 0 (Kanpur Ring road) to design km117.700 in UP (Sec1)and Overlay/Strengthening other road safety and imp.works existing Kanpur Kabrai sec.7.430 to 130.100 (0 to 123.860)NH 34 in UP
Const.of 4L AC GF alignment of Southern bypass to Jhansi and CL for NH44 n NH39 from Km.16.920 of NH44 near Bangay khas vill.DC 0.030 and terminating forming T junc at Km6.650 of NH39 near Orchha Tigela DC15.542 L15.572km in MP and UP on EPC mode
One Time improvement of NH-9 (Rohtak Road) From Punjabi Bagh underpass till Tikri Border in the State of Delhi on EPC Mode
Construction of 4 L of Ujjain Jhalawar Sec of NH 552G from Ch.0.000 Village Khilchipura to Ch.86.500 Village Aakli Kadiya (PKG 1) in the State of Madhya Pradesh on EPC Mode under NH(O).
Construction of 4L of Ujjain Jhalawar Sec of NH 552G from Ch.86.500 Aakli Kadiya to Ch.159.263 Jhalawar (Jn with NH52) PKG 2 in the State of Madhya Pradesh and Rajasthan on EPC Mode under NH(O)
Consultancy Services for AE for Supervision of Construction of 4-Lanning of Ujjain-Jhalawar Section of NH-552G from Ch.86.500 Village Aakli-Kadiya to Ch.159.263 Jhalawar (Junction with NH52) (Package-2) in Madhya Pradesh and Rajasthan EPC NH(O)
Consultancy Services for AE for Supervision of Construction of 4-Lanning of Ujjain-Jhalawar Section of NH-552G from Ch.0.000 Village Khilchipura to Ch.86.500 Village Aakli-Kadiya (Package-1) in Madhya Pradesh on EPC Mode under NH(O)
Surgical Air Disinfection System with Sensing & Reporting Technology using HEPA and UV Technologies
CS for IE services for Development of 4 lane Badvel to Nellore Highway from Badvel Gopavaram Village on NH NH-67 (Ch.630.960) to Guruvindapudi Village on NH-16 (Ch.739.094) in Andhra Pradesh on Build-Operate-Transfer (Toll) mode for a TL 108.134 km.
Construction of 4lane GF Amritsar-Katra connectivity of Amritsar with DAK Expressway from MDR Junction at ch.40.900 Dhunda Village-Junction NH3 and Taran Taran Bypass near Mannawalla village ch.70.950 (Km 40.900-Km 70.950 Pkg-2) on EPC Mode in Punjab
Construction of 03 nos. of 3 lane ROBs and 07 no of VUPs on 6L Delhi Agra Section old NH-2 (New NH 44 and 19) from Km. 20.500 to Km. 200.000 in the State of Haryana and Uttar Pradesh on EPC Mode.
4L of Kolhapur Sangli sec of NH166 from Sangli Phata km 0.00 to Chokak km 7.738 n Chokak km 145.300 to Ankali km171.171 Length33.609 km in Maharashtra to be executed on Hybrid Annuity Mode under NH O
BW Cons. 4lane GF DAKE from Jalandhar Moga road (NH703) to Jalandhar-Kapurthala road (NH703A) (Km 303.900 to 319.400) and Jalandhar Moga road (NH703) to Kapurthala Sultanpur Lodhi road (NH703A) (km 0 to 24.000) in Punjab (P10)
Balance works for Cons. of 4-lane Greenfield Delhi Amritsar Katra Exp. from Jun. with Ludhiana Malerkotla Road (SH11) near Bhogiwal village to Junction with Ludhiana Moga Road (NH5) (Km 225.770 to km 260.860)on EPC mode under NH(O) in Punjab (PKG-08)
Cons of 6L GF AC Indore Eastern Bypass from km 113.000 on NH 347BG near Simrol/Datoda end at km 139.630 Nanded PKG2 of Indore dist n Rehab n upgrade of exist NH52 from km 18.000 Khandwa to km 27.000 Ahilyapur from 4to6L PKG2 of Indore in MP on HAM
Construction of 6L GF AC Indore Eastern Bypass starting from DC KM 64.000 near Pirkaradiya village and ending at DC KM 113.000 on NH 347BG near village Simrol/Datoda PKG 1 of Indore and Dewas district in Madhya Pradesh on HAM Mode. L 49.00 Km
Upgradation of existing Highway to 4 laning Standard from Pachpadara Bypass (Ch. 95.780) to Patau Interchange (Ch. 115.003) Section of NH25 in the State of Rajasthan on EPC mode.
Dev of 4/6L of AC Kanpur Kabrai GF highway start 0.000 (Kanpur Ring road) to 117.700 near Kabrai Sec1 and Overlay/Strengthen other road safety and improvement works on exist Kanpur Kabrai sec from 7.430 to 130.100 of NH34 in UP Sec2 on DBFOT pattern
IE Services for 4Laning of Jagtial-Karimnagar Section of NH-563 from Jagtial Bypass Start at Design Ch.0.000 (Ex.chainage 90-500 on NH-63) to Design Ch.58.866 km (Ch.170.400 km) at Karimnagar Bypass End (58.866 km) to be executed on BOT mode NH O
Construction of 6-lane Elevated Corridor from Maduravoyal Junction (Chainage Km 13.965) Chennai Outer Ring Road (Chainage Km 22.100) including Junction Improvements at km. 22.368 of NH-48 (Old NH4) in Tamil Nadu on Hybrid Annuity Mode (Project Lengt
Construction of six lane Greenfield Highway starting from its Junction with NH4B (New NH348) near Pagote (Design km. 0.000) till its Junction on NH48 at Chowk (Design km. 29.219) in Maharashtra to be executed on BOT (Toll) mode under NH(O)