Loading…
Loading…
190 results • Latest
Renovation and annual maintenance of Tubewell Rooms in Chhawla Ward in Matiala constituency under EE(C )-26
4-laning of Armoor - Jagtial - Mancherial Section of NH-63 from Jagtial (design km. 92.700) to Mancherial (design km. 160.995) total length 68.295 on Hybrid Annuity Mode (HAM)
4-laning of Armoor - Jagtial - Mancherial Section of NH-63 from Armoor (design km. 29.100) to Jagtial (design km. 92.700) (total length 63.300 km) on Hybrid Annuity Mode (HAM)
AE Ser for Const.6L EC at Pigdambar Chauraha Km14.235 n Medicaps Km13.430 VUP at Sirsodiya Junct. at Km61.660 Flyovers at Dhanmod Bypass Start Km77.800 n Dhanmod Bypass End Km.86.100 under road safety improvement on Indore Khalghat Sec of NH52 in MP
Hiring of Agency for IT Projects- Milestone basis
Carrying out Detailed Project Report (DPR) study for Development of Ropeway Projects in the State of Madhya Pradesh - Chhattisgarh
Carrying out Detailed Project Report (DPR) study for Development of Ropeway Projects in the State of Maharashtra
Carrying out Detailed Project Report (DPR) study for Development of Ropeway Projects in the State of Andhra Pradesh AND Karnataka
Hiring of back hoe loader wheel mounted of having a loading bucket with driver and ONE LMV small with auto tipping facility with driver for day to day maintenance work in Ward No. 133 Mahipalpur NGZ.
DEVELOPMENT, OPERATION AND MAINTENANCE OF WAYSIDE AMENITIES 7 O-M SITES ON LEASE BASIS IN THE STATE OF MAHARASHTRA NH-361/43-250 to 43-450/Ausa Distt./Latur/Maharashtra
DEVELOPMENT, OPERATION AND MAINTENANCE OF WAYSIDE AMENITIES 7 O-M SITES ON LEASE BASIS IN THE STATE OF MAHARASHTRA NH-361/ O-M/ Chakur- Loha/ Hottalwadi/ Ch. 185.200/ LHS/ PIU- Nanded
Procurement of online thermo-scanning system solution for 400KV side Jatikara substation and 220KV s
Markin Cloth (V2) (Q3)
Desilting of Vaishali Drain from Balaji General Store to I and FC Drain (near Jindal Public School) in Ward No. 117, Dabri/NGZ
Desilting of Drain 1) P andT Barat Ghar to Dabri Nasirpur Road, West Sagarpur 2) Gali No.6, Main Sagarpur Nallah in ward No.118 Sagarpur NGZ
Desilting of Drain Nagar Van Park Road Nallah (BOTH SIDE) in Ward No.118 Sagarpur NGZ
Desilting of Drain Nasirpur Road Along M.C Pry. School to Manglapuri Chowk (Both Side) in Ward No.119 Manglapuri in AC-33 NGZ
Digital VHF Repeater Set as per MHA QR (Q2) (3 (3 ))
Desilting of drain Opposite Phase-II JJ Colony in Sector 03 Dwarka in Ward No. 121 Dwarka-A/NGZ
POLYAMIDE MONOFILAMENT SIZE 2 0 70 80 CM 3 8 CIRCLE RESERVE CUTTING 40 45 MM, POLYAMIDE MONOFILAMENT SIZE 30 70 80 CM 3 8 CIRCLE REVERSE CUTTING 25 30 MM, Poliglecaprone, size 3 0, 70 75cms 3 8 circle cutting 20 25 mm, POLYPROPYLENE BLUE MONOFILAMENT 70 75 CM SIZE 4 0 1 2 CIRCLE RB 25 MM DOUBLE NEEDLE, Polypropylene blue monofilament 70 75cm size 5 0 3 8 ircle RB 12 18mm double needle, POLYPROPYLENE BLUE MONOFILAMENT 70 75 CM SIZE 5 0 3 8 CIRCLE REVERSE CUTTING 12 13 MM DOUBLE NEEDLE, Tab Apremilast 30 mg, CLOTRIMAZOLE MOUTH PAINT 1percentage BOTTLE OF 15 ML, ADAPALINE 0 point 1 percentage TUBE OF 15 GM, Tacrolimus oint 0 point 03percentage 20 gm tube, Benzoyl Peroxide 2 point 5 percentage Tube of 20 gm Tube, Zinc Oxide Titanium Dioxide Bott SPF 50 Sunscreen lotion Bottle of 60 ml, Clindamycin phosphate 1 percentage topical gel Tube of 10 gm, Fluticasone0 point 05 per w w cream tube of 10 gm, Glycerin Glycerol in bottle of 1 Kg, PERMETHRIN 5 percentage TUBE OF 30 GM, PARAFFIN SOFT YELLOW JAR OF 4 KG, TERBINAFINE 1 percentage CREAM TUBE OF 10 GM, TRETINOIN 0 point 025 percentage TUBE OF 15GM, Coal tar 6percentage v w puls salicylic acid 3 percentage ointment 50 gm Tube, Extractum. Capae, Heparin Sodium allantoin gel 20 gm Tube, Halobetasol propionate lotion 0 05 percentage w v bottle of 30 ml, Fusidic Acid cream 2 percentage w w 10 g Tube, 13 9 percentage Eflornithine cream 15g Tube, Calcipotriol 50 ugm gm Tube of 30gm, Povidone iodine solution 5 percentage bottle of 100ml, Paraffin Liq in bott of 100 ml, Isabgol Husk sachet 3 5gm, Triclofos Syp 500 mg 5ml in 30ml bottle Bid Number : GEM/2026/B/7067032 Dated : 21-01-2026 Bid Document 1/28
Consultancy Service for preparation of Sustainability Report of NHAI
Balance work for Const. of 8L access controlled expressway from km 154.6 to Km 190.0 of Vadodara Mumbai Expressway (Jujuwa to Gandeva section)in Gujarat on EPC mode Pkg VIII
CS for AE for Upgrad of Yagyi Kalewa sec milepost 40 0 to milepost 115 5 in Myanmar to Two lane with earthen shoulder on EPC Mode.
Diamond Chain Saw (Q3) (3 (3 ))
Development of 8-Lane Elevated Flyover at Tier-1 on Single Pier including Upgradation of Existing Road to 4/6 Lane with 2 Lane Service Road on both sides of Nashik Phata to Khed (Pkg2 28.925 to km 42.113) section of NH60 in Maharashtra on (BOT) Mode.
Development of 8Lane Elevated Flyover at Tier1 on Single Pier including Upgradation of Existing Road to 4/6 Lane with 2 Lane Service Road on both sides of Nashik Phata to Khed (Pkg-1 12.190 to km 28.925) sec of NH60 in Maharashtra on BOT (Toll) Mode.
Development of 8Lane Elevated Flyover at Tier1 on Single Pier including Upgradation of Existing Road to 4/6 Lane with 2 Lane Service Road on both sides of Nashik Phata to Khed (12.190 to km 42.113) section of NH60 in Maharashtra on BOT (Toll) Mode.
Tent Extendable Frame Supported 4M and 2M Complete with Accessories (V2) (Q2) ( ( 3 3 )) OEM Average Turnover (Last 3 Years) 500 Lakh (s)
Access Controlled Highway of 4 lane with paved shoulders from Walajapet/ Ranipet (Design Chainage km 106.800) to TN/ AP Border (Design km 134.879) of NH40 in Tamil Nadu on Hybrid Annuity Mode (Project Length 28.079 kms)
4 Laning of Marakkanam-Puducherry Section of NH-332A from Km 62.000-Km 108.047 in Tamil Nadu on HAM (Project Length-46.047 km) (Mahabalipuram-Puducherry Package-III)
4 Laning of Paramakudi to Ramanathapuram Sec of NH49 New NH87 from Km 80.360 to Km 127.025 DC in Tamil Nadu on Hybrid Annuity Mode (Project Length-46.665Km)
Construction of New Double Tier 4-lane Elevated Corridor from Chennai Port to Maduravoyal in Chennai District from km 0.342 to Km 20.223 on EPC mode under Bharatmala Pariyojana in the State of Tamil Nadu-Package-I (km 0.342 to Km 4.604)
Independent Engineer Services for 4 Laning of Marakkanam-Puducherry Section of NH-332A in Tamil Nadu on HAM (Project Length-46 km) (Mahabalipuram-Puducherry Package-III)
Independent Engineer Services for 4 Laning of Paramakudi Ramanathapuram Sec of NH87 in Tamil Nadu on HAM under NH(O) Project Length-46.665 km
Authority Engineer Services for Balance Works for Four laning of Vikravandi to Sethiyathope section (from Km 0.0 to Km 65.96) of NH-45C in Tamil Nadu under NHDP Phase-IV on EPC mode (2nd Call)
IE Services for AC Highway of 4Lane with Paved Shoulders from Walajapet Ranipet to TN AP Border of NH40 in TN on HAM under NH(O) (Project L28.021 Km)-(3rd Call)
Digital Storage Oscilloscope (Q3) (3 (3 ))
Balance work of Four Laning of the project Highway from End of Pinjore bypass-Baddi-Nalagarh Section (Km. 4.200 to 34.500) on NH-21A (New NH-105) in the State of Haryana and Himachal Pradesh on EPC Mode
DEVELOPING, OPERATING AND MAINTAINING OF WAYSIDE AMENITIES ON DELHI AMRITSAR KATRA EXPRESSWAY IN J-K SECTION ON LEASE BASIS (3 DBOT SITES).DAK9/Gurdaspur-Katra/Pkg 15/469PLUS350/RHS/JK
DEVELOPING, OPERATING AND MAINTAINING OF WAYSIDE AMENITIES ON DELHI AMRITSAR KATRA EXPRESSWAY IN J-K SECTION ON LEASE BASIS (3 DBOT SITES).DAK9/Gurdaspur-Katra/Pkg 14/467PLUS800/LHS/JK
Supervision Consultant services during OM phase for Four Laning of NH709B from KM 92.200 (near Shamli) to km 155.025 (near Saharanpur) design km 61.409-km 124.181 (length 62.772 km) in the state of Uttar Pradesh (Package-II) on EPC mode
Digital Storage Oscilloscope (Q3) (3 (3 ))
CS-AE for Upgradation with Rigid Pavement of Existing 2-Lane Carriageway to 2-Lane Carriageway with Paved Shoulder from Ch.665.686 (Km.665.686) in Khanpur Village to Ch.710.470 (Km.710.483) in Karvad Village (TL 44.784 Km) of NH-56 in Gujarat on EPC
Construction of 4-lane Thiruvarur Bypass (Km 15.900 Km 30.836) in Nagapattinam Thanjavur Section of NH83 in Tamil Nadu on Hybrid Annuity Mode (Project Length 14.936 km)
Consultancy Services of AE for Construction of 6-Lane Patna Ring Road Highway NH-131G from Kanhauli to Sherpur from Km.0.000-Km8.480 including Junction Development with Bihta-Danapur elevated corridor App.length-1.5 Km on EPC Mode in Bihar L-9.98Km
Manpower Outsourcing Services - Fixed Remuneration - Admin; Data Entry Operator; Secondary School
Const of Gr Separated Structure at 24.907 Abhava Jn 25.720 Mindhola Jn 27.121 Khajod Jn include RE Walls Service Rd and Drains along with missing Service Rd and conversion of Earthen Shoulder to PS on Hazira Port Surat GJ/MH Border of NH53 in GJ on E
Construction of 2 lane with paved shoulder from Hiwarkhedi-Roshni NH-347B from km 0.000-km 90.010 and 2-4 Lane from km 114.000 near Ashapur Village to km 149.000 near Rudhy village of Betul-Khandwa corridor 125.010 km in MP on HAM under NHO
Up-gradation of existing 2 lane to 4 lane with paved shoulder from Deshgaon to Julwaniya section of NH-347B from design km 0.000 Existing km 99.924 on NH-347BG to design km 108.643 (Ex km 129.900 on NH-52) under NH(O) in Madhya Pradesh on HAM
Hard Carry Case: Weapon Box (Type - A), Hard Carry Case: BR vest and plates box (Type - B)