Loading…
Loading…
45 results • Latest
Construction of Perimeter Roads on Both sides of Emergency Landing Facilities (ELF) including ATC Plinth (50m x 50m) on Chilakaluripeta Nellore Section of NH16 from Km. 1210.000 to Km. 1214.600 in Andhra Pradesh on EPC Mode
Construction of ROB at Alluru Road at Km 1341.950 (RHS) on Chilakaluripet-Nellore section of NH-16 (Km 1182.802 to Km 1366.547) in the State of Andhra Pradesh.
CS for IE services for Development of 4 lane Badvel to Nellore Highway from Badvel Gopavaram Village on NH NH-67 (Ch.630.960) to Guruvindapudi Village on NH-16 (Ch.739.094) in Andhra Pradesh on Build-Operate-Transfer (Toll) mode for a TL 108.134 km.
fixed gas detector, portable gas detector
Helmet with headlamp for FF DC, Antiflash hood for fire fighters, Gloves for fire fighter, Rubber boots for fire fighter suit size 8, Rubber boots for fire fighter suit size 9, Coupling female, Coupling male, Fire hose box