Loading…
Loading…
330 results • Latest
Liquified Petroleum Gas (LPG) as per IS 4576 for Bulk Supply (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Construction of Box Culverts at identified locations along the E-F and B-D diversion drains, at NTPC Darlipali
Contract for Technical Expert Supervision work by OEM for Ebara makepumps installed in NTPC Darlipalli
52kV, 3150A RIP Bushing with metal parts and Gaskets as per POWERGRID TS for NER, 52kV 3150 A RIP or RIS Bushing solid Stem with Metal Parts and Gasket for NR-III, 52 KV 3150 A LV RIP or RIS bushing Solid stem With Metal Parts And Gaskets for NR-I Grp-I, 52 KV 3150 A RIP or RIS bushing Solid stem With Metal Parts And Gaskets for NR-I Grp-II, 52kV 3150A, RIP or RIS Bushing Solid stem With Metal Parts And Gaskets for NR-II, 3150 Amps RIP or RIS bushing Solid stem type with metal part and gasket for Odisha, 52kV 3150A Solid stem type RIP or RIS Bushing with Metal Parts and Gasket for WR-I, 52kV 3150A Solid stem type RIP or RIS Bushing with Metal Parts and Gasket for ER-I
Shifting of Precast RCC Box culverts Culverts (4 Nos) Towards existing Railway track for construction of tower foundation NTPC Darlipali
M8752715700, M8752715701, M8752715702, M8752715703, M8752715704, M8752715705, M8752715706, M8752715707, M8752715708, M8752715709, M8752715710