Loading…
Loading…
291 results • Latest
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT 5144G Fabrication Dismantling Erection strengthening modification of various chutes hoppers wagon tipplers belt conveyors crusher houses and its associated auxiliarie..
Construction of Winch foundation near bottom ash scraper at 0.00 mtr of unit 6 at Ukai TPS.(WT-5149 Civil PH)
Providing and laying G. I. Pipe at various locations in CHP area at Ukai TPS.(WT-5141 Civil PH)
Supply, Erection, Testing and Commissioning of 220 V DC, 510AH, KBH, Ni-Cd type Battery Set for 500MW Unit-6 at GSECL Ukai TPS. (EMD - 6 ET-6215)
Supply of Various Fasteners and Consumables for CHP at UTPS. (CHP Maint. (Mech) ET-6238)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT5131G Work of White metal Bearings clearance Magnetic centre Air gap measurement setting and emergency replacement lifting and shifting O H dismentalling and checking ..