Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
838 results • Latest
LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2), Miniature Circuit Breakers (MCB) for AC Operation Marked To IS/IEC 60898 (Part 1) (Q2), XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Turnover Yes | Complete
LED Luminaire For Road And Street Lights Conforming To IS10322 (Part5/Section3) (V3) (Under BISScheme-II) (Q2)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Pipelines, valves presure valves; Buyer
Combined Emergency shower and Eye washer
Parker make o ring
Video Conferencing End Point (Q2)
Fabrication and erection of duct and its structural supports for ventilation in additional chiller area at KAPS-3 and 4
Professional Painting Service - Walls; Exterior Walls; NA
Internal hard disk compatible for Dell PowerEdge R530 Server as per attached technical specification
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2), Drinking Water Coolers (V4) ISI Marked To IS 1475 (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Hemodialysis Machine (Q2) (3 (3 ))
Bilirubinometer (Q3)
Material code: W90418110018 GROUNDING BRUSH MONITOR, POWER SUPPLY 240VAC(+ 10%, 10% ) 50H Z, INPUT 0-2, Material Code: W90418110026 COMMISSIONING OF GROUNDING BRUSH MONITORING SYSTEM
LED Luminaire For Road And Street Lights Conforming To IS10322 (Part5/Section3) (V3) (Under BISScheme-II) (Q2)
Pole-Mounted Outdoor Dustbin (Q3)
Security Manpower Service (Version 2.0) - Office/Commercial/Institutions/Residential; Watch and Ward
Supply, installation, commissioning of Area Gamma Radiation Monitor, Integrated Radiation Monitoring software for Area Gamma Radiation Monitor
Industrial Safety Glove/Gauntlet (V2) (Q3)
Reagent Pack (CAL-A: 800 Ml, CAL-B: 280ml) : Compatible With HDC Lyte Electrolyte Analyzer Machine, Daily Cleaner For Electrolyte Analyzer, Model: HDC-Lyte (6x15ml)
EMRS uniforms
Sanitary Items
Silica Gel (V2) Conformingto IS3401 (Q3)
Printing & Supply of WMP log-book as per given sample/specimen
Electrocardiography (ECG) Machine (V2) (Q2)
Operation And Maintenance Of Other Machines And Plants - Complete System
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT 5163G Work of erection and commissioning of Elecon make Operator Cabin in Stacker Cum Reclaimer and dismantling of existing Cabin installed in coal handling plant at ..
LPP 2658 Supply of spares for H2 dryer of Unit 4 Ukai TPS
Supply of Glass Counting Vial and Spares
Manpower Outsourcing Services - Minimum wage - Skilled; Graduate; Admin
Catering service (Duration Based) - Veg; Lunch; Special Buffet
High Mast Lighting Octagonal Tower for Small area with LED Flood Lighting System (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Waste Container (V3) (Q4)
Operation and Maintenance of Effluent/Sewage Treatment Plant - Complete System; As per Tender Spacification; Functional but outside AMC and Warranty
Electric Ceiling Fan (V4) ISIMarkedto IS374 (Q2)
ET 6289 Supply of various size Viton O rings
Paper Punch Machine(V2) (Q4), Paper Clips (V2) Conforming to IS 5650 (Q4), Metric Scale (V2) Conforming to IS 1480 (Q4), Tags For Files (V3) Conforming to IS 8499 (Q4), File/Folder (V3) (Q4), Tailor's Scissors (V2) Conforming to IS 989 (Q4), Sticky Notes (V2) (Q4) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - PW 101G Work of dismantling old damaged pipes and erection of air and water pipe line and fabrication of structure at various locations in ash plant area in Unit 4 durin..
Paper Adhesives, Liquid Gum and Office Paste Type (V2) Conforming to IS 2257 (Q3), Staplers(V3) (Q4), Black Lead Pencils (V3) Conforming to IS 1375 (Q4), Pressure Sensitive Adhesive Tapes with Plastic Base (V4) Conforming to IS 13262 (Q4) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Whiteboard Duster (V2) (Q3)
Markers and Highlighters (Q4), rubber bands (Q4) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Cleaning, Sanitation and Disinfection Service - Outcome Based - Office/Commercial/Institutions/Residential; General Cleaning (Sweeping, Mopping, dusting); Indoor, dusting); Outdoor
Lightemittingdiodedriver (Q4)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - PW-80G - IMD-II - Work Contract for Quarterly Servicing, Maintenance & Calibration of SEPL make SWAS Analyzers of Unit no 3 of Ukai TPS; Quarterly Servicing, Maintenance..
Anti-Seize Compound (Q3)
Impeller For Gland Steam Blower, Make: M/s. Airochem Engineering Company, EPDM Bellows For Gland Steam Blower, Size 250NB Make: M/s. Airochem Engineering Company
Supply of canned motor pump complete assembly with fitted bearing wear monitor
Supply of Soares for active ProcesWater Pumps
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - PW 104G emergency Work of removing of Slurry Pipe lines/Bends and valves from ash dyke area A and shifting (transportation) up to Main store/BHEL yard nearby safety of..
LED Batten with Battery/Inverter
Operation And Maintenance Of Substation - As per tender