Loading…
Loading…
730 results • Latest
Astronomical Timerfor Street Light Control (Timer Controls) asper IS9000 (Q3)
EMRS uniforms
Sanitary Items
Silica Gel (V2) Conformingto IS3401 (Q3)
Printing & Supply of WMP log-book as per given sample/specimen
Electrocardiography (ECG) Machine (V2) (Q2)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT 5163G Work of erection and commissioning of Elecon make Operator Cabin in Stacker Cum Reclaimer and dismantling of existing Cabin installed in coal handling plant at ..
LPP 2658 Supply of spares for H2 dryer of Unit 4 Ukai TPS
Supply of Glass Counting Vial and Spares
Manpower Outsourcing Services - Minimum wage - Skilled; Graduate; Admin
Catering service (Duration Based) - Veg; Lunch; Special Buffet
High Mast Lighting Octagonal Tower for Small area with LED Flood Lighting System (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Waste Container (V3) (Q4)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; Maintenance, Testing And Inspection Of BHEL Make 6MW Primary Circulating Pump Motor Sl No 40159P423-11-07 For KAPS-3&4; as per Scope of Work
Paper Punch Machine(V2) (Q4), Paper Clips (V2) Conforming to IS 5650 (Q4), Metric Scale (V2) Conforming to IS 1480 (Q4), Tags For Files (V3) Conforming to IS 8499 (Q4), File/Folder (V3) (Q4), Tailor's Scissors (V2) Conforming to IS 989 (Q4), Sticky Notes (V2) (Q4) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - PW 101G Work of dismantling old damaged pipes and erection of air and water pipe line and fabrication of structure at various locations in ash plant area in Unit 4 durin..
Paper Adhesives, Liquid Gum and Office Paste Type (V2) Conforming to IS 2257 (Q3), Staplers(V3) (Q4), Black Lead Pencils (V3) Conforming to IS 1375 (Q4), Pressure Sensitive Adhesive Tapes with Plastic Base (V4) Conforming to IS 13262 (Q4) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Whiteboard Duster (V2) (Q3)
Markers and Highlighters (Q4), rubber bands (Q4) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Cleaning, Sanitation and Disinfection Service - Outcome Based - Office/Commercial/Institutions/Residential; General Cleaning (Sweeping, Mopping, dusting); Indoor, dusting); Outdoor
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - PW-80G - IMD-II - Work Contract for Quarterly Servicing, Maintenance & Calibration of SEPL make SWAS Analyzers of Unit no 3 of Ukai TPS; Quarterly Servicing, Maintenance..
Anti-Seize Compound (Q3)
Impeller For Gland Steam Blower, Make: M/s. Airochem Engineering Company, EPDM Bellows For Gland Steam Blower, Size 250NB Make: M/s. Airochem Engineering Company
Supply of canned motor pump complete assembly with fitted bearing wear monitor
Supply of Soares for active ProcesWater Pumps
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - PW 104G emergency Work of removing of Slurry Pipe lines/Bends and valves from ash dyke area A and shifting (transportation) up to Main store/BHEL yard nearby safety of..
Operation And Maintenance Of Substation - As per tender
Supply of Spare Diapharagms
EBAC ACS server with server and client hardware and supporting software as per specification
RUPTURE DISC (Part no. - 01) AS SPARE FOR NPCIL EQPT. TAG NO. : 3232-RD-1 SIZE: 1" (25 NB), Rupture disc (Part no. - 01) AS SPARE FOR NPCIL EQPT. TAG NO. : 3211-RD-1 SIZE: 4" (100 NB), COMPRESSION LOADED REVERSE BUCKLING RUPTURE DISC (PART NO. - 01), RUPTURE DISC (Part no. - 01) AS SPARE COMPONENT OF VAM CHILLERS
Temperature scanner Model No. Transformer Protection relay TR-7576-C (85-270 V AC/DC) as per speci.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT-5161G; Power House Equipment; As per ATC
Manpower Outsourcing Services - Fixed Remuneration - Admin; SAMAJ SURAKSHA SAHAYAK; Graduate
Ion Chromatography System (Q3)
Passive Night Vision Binocular as per MHA QR (V2) (Q2), binocular (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
LPP-2647 Supply of analog fast MDL MAXPAC FAST ANALOG O P MODULE, BHEL CODE: ED69230I321A
Plastic Chairs For General Purposesconformingto IS13713 (V3) (Q2)
Dialtypeindicating Pressure Gauges (Q3)
Calibration Services - Electrical, WT 5118G Calibration of Electrical Measuring Instruments for Ukai TPS; Voltage, Current, Power (AC/DC), Frequency, Power Factor, Phase Angle, WT5118G Calibration of Electrical Measuring Instruments for Ukai TPS; NAB..
Reverse Osmosisbased Water Treatment Systemabove50 LPH Capacity (V2) (Q2)
Catering service (Duration Based) - Veg; Lunch; Special Buffet
Household Refrigerating Appliancesasper IS17550 (Q2)
Facility Management Services - LumpSum Based - CHC; Health Equipment; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - CHC; Health Equipment; Consumables to be provided by service provider (inclusive in contract cost)
Bamboo Tent Poles (V2) as per IS 7344 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - PW-78Biennial maintenance contract of service charges Servicing/Repairing/Trouble shooting of Hitachi Hi-Rel make 220 V DC 2 X 200ampFCBCbattery chargers Unit # 3, 4 &5 U..
Sewing Machine as per IS 1610 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Facial Kit (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Testing Service for On-Board/Commissioned Equipment Instrument related to Plant - Mechanical, Ferrography; Ferrography analysis for Moisture, Noise & vibration, Quantitative (WPC) Ferrography Analysis, Quantitative (WPA) Ferrography Analysis, Ferro..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - PW-110G (MMD-HPS) Work of inspection and preventive/breakdown maintenance of the CO2 flooding system of 4X75 MW HPS and for 2 X 2pt5 MW Mini Hydro Power Station at GSE..