Loading…
Loading…
4,198 results • Latest
Entry and Mid Level Laptop - Notebook (Q2) (3 (3 ) )
PANCHAYAT OFFICE ELECTRIFICATION
DRINKING WATER SUPPLY
Annual Plan-WADAKKANCHERY MUNICIPALITY MELEBHAT GANGADHARAN ROAD RENOVATION DIVISION-13 PRO NO-976/2025-26-.-General Civil Work
Annual Plan-Wadakkanchery Muncipality (978/2025-26) Balakrishnan Nair Road Renovation Div-13-.-General Civil Work
Annual Plan-Pro.No.713/2025-26.GREEN PARK ROAD CULVERT IN Dn.32, WADAKKANCHERY MUNICIPALITY.-CULVERT CONSTRUCTION-General Civil Work
Supply Of Paddy to Guruvayur Devaswom
GENERAL UCR in Thrissur District 2024 25 Improvements to Koombully Idiyanchira Bund Road in Ward 1 of Mullassery Panchayath and Ward 13 of Elavally Panchayath General Civil Work
NABARD RIDF XXX Development Upgradation and Associated Infrastructure works Refurbishment of Existing structures in Chettuva Fishing Harbour
To cut and remove ,the already fallen trees inside the canal and branches of standing trees and felling trees, which threaten to the life and property, engaging labour and engaging hitachi for removing slipped earth in canal and chiras
Felling trees cutting branches of tree of girth 90cm to 120cm and girth beyond 120cm,engaging labour for removing slipped earth in canal and chiras and Hire charges of Hitachi other hydraulic machineries for removing fallen tree
The provisions for clearing grass and engaging man mazdoor for removing obstructions in canal were also given in the estimate.
Facility Management Services - LumpSum Based - Government Department; Purchase of Photocopier; Cost of consumable to be reimbursed to service provider on actual
Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others
Jal Jeevan Mission (JJM)-JJM- WSS to aloor ,kodakara (part1)- Supply and Laying of CWPM from chalakudy WTP to water tanks-General Civil Work
Annual maintenance of RBMC between ch 13 000 km to 30 400 km
Renovation of the pond
HT Interlinking Ezhamkallu and Kollannur Temple under Electrical Section Mundur
Annual Maintenance Service - Desktops, Laptops and Peripherals - UPS (Online 5 KVA); other
A n n u a lm a i n t e n a n c e
(JJM)-Jal Jeevan Mission Phase II-2022-2023 WSS to Thiruvillwamala, Kondazhy and Pazhayannur Panchayaths-Soil exploration test at Proposed WTP site - Construction of 15 MLD water treatment plant at kuthampully (LS)-General Civil Work
Jal Jeevan Mission (JJM)-JJM-WSS to Aloor and Kodakara (Part I) Panchayaths in Thrissur District - Production Components -Construction of 10 MLD WTP (LS Estimate)-General Civil Work
THYMOL Vertical Autoclave Brand: THYMOL (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687764903459 dt.23/09/2026)
Maintenance of various trekpaths in Kollathirumedu Range Neelapara SCurve1.6Km Nellivalavu Pathipara1.9Km Kalakalmachan Kalakalkuthu2.1Km Idinjapalam Iruvelikallu1.2Km Total 6.8Km
Maintenance, operation and upkeep of Thrissur Zoological Park, Puthur including gardens, vertical garden, landscapes, lawns, pathways, drainage system etc
Maintenance of various trekpaths in Kollathirumedu Range Nayattupara Pachilavalam 3 Km Kuppikallu Peterpalam 2.5 Km Pachilavalam Kuppikallu 2.5 Km
Hiring of vehicle below 15 years , taxi permit including driver,fuel for ES Kuzhur for 1year.
AMRUT_2_Chavakkad Municipality_Supplying and laying of distribution network and providing FHTCs_ Additional work_2_ Pookkulam Tank_Renovation Work_ General Civil Work
Annual Plan-2025-26/KDY- Pr.No 92/26 Lift Irrigation Pipe Line Extension Kadukutty GP -Chalakudy BP-General Civil Work(Retender)
Project No 94/26-27-THRISSUR CORPARATION 2026-27 VILVATTOM ZONAL DIVISION 6 SANDHYARAMAM CANAL ROAD BY LINE ROSINS LINE PADUKKAD B B C LINE ASHA BHAVAN ROAD AKASAVANI ROAD RETARRING SIDE CONCRETING DRAIN CONSTRUCTION
Thrissur Corporation KKY zonal 2026-27 Div 41 Maintenance works of Hero nagar, Gurudeva nagar road ,Palliparambu road Fantasy road Friends avenue road krishnapilla road EM Ashraf road Gangappan roads in vadookara project no 270/2026-27-Div 41-
Annual Plan-Thrissur Corporation-2026-2027- central zonal-Division 36-Maintenance of Drain in VBS lane -Project No.678-General Civil Work
GENERAL Pro No 2226/26 -THRISSUR CORPORATION OLLUKARA ZONAL DIV 11 ANGANAWADI NO 42,38,40 MAINTENANCE .General Civil Work
concreting
Concreting
Concreting
Maintenance/Repair works of KSHB Thrissur Division office complex
ANGANWADI NO 20 ELECTRIFICATION - WARD 8
LAC ADS 2020-21 MANALUR LAC - CONSTRUCTION OF SAMSKARIKANILAYAM AT VENKIDANGHU GP IN MULLASSERY BP
Annual Plan-Thrissur Corporation-2026-2027- central zonal-Division 36-Maintenance of Drain in Krishana Garden-Project No.679- General Civil Work
Annual Plan-Project No 394/26-27-Thrissur Corporation Olukkara Zonal Div 13 Mullakkara Hill Paddy Aanakottil Drain Construction- General Civil Work
Thrissur Corporation West Zone 2026-27 Construction of Drain Cover Slabs at Calvary Road,Chakko Memmorial Road,U P School Byelane Pro no-666/2027-Annual Plan-General Civil Work
126927 LAC-ADS-Construction of new Building for GMLP School Mala-LAC ADS-Construction of new Building for GMLP School Mala- Electrification-General Electrical Work
Thrissur corporation KKY Zonal 2026-2027-Krishi bhavan road maintenance-Irish drain construction of drainage coverslab irish drain and culvert at Galaxy road Vadookkara junction Vattappinni junction Manavazhy road Nirmalapuram road Gandhi nagar Sanka
Thrissur corporation koorkenchery zonal 2026-27 -Convent road retarring in division 44 pro no 455
Entry and Mid Level Desktop Computer (Q2), A4 and Legal Size Multifunction Printer (MFP) (Q2) (3 (3 ))
Thrissur corporation kky zonal 2026-27-Road maintenance of menakedymoola to mini stadium road in division 44 pro no 425
THRISSUR CORPORATION 2026-27 AYYANTHOLE ZONAL , DIVISION 46-THODU CLEANING OF PUTHAN CHAL TO KARTHYAYANI TEMPLE
Installation of 5 line solar fencing 4 KM from Kuthiran to Poovanchira under Pattikkad Forest station under Pattikkad Range during 2026-27
Construction of 11 KV line using ABC and 100 KVA Transformer installation at Ambedkar under Electrical Section Perumbilavu