Loading…
Loading…
1,517 results • Latest
Construction of 48 nos West weir MPT and SP and PT
Construction of ECD WW and Field outlet west weir
Construction of PCD.MPT. Field outlet weste weir
Construction os sunken pond in non arable land
RTWHS with Soak pit and Sunken Pond
Construction of Anicut PCD and WHS
Construction of kachcha pakka Non Arable works
Construction of pakka Non Arable and DLT Work
Construction of kachcha pakka Arable works
Uniyara Shahar mei Sthit Khel Maidan mei Running Track Nirman evam Vidyut Pole Lgane ka karya
Construction of BT Road from Nayagaon to Rajkot
Widening and Strengthening of SH-12 to Chosla Km 0/0 to 1/200
Construction of Remaining work of Box Culvert on Dundiya to Kureda Road Km 0/0 to 3/0
Thermal Temperature Indicator Strip (non reversible type and self adhesive type) Range-50 Degree C to 120 Degree C . As per attached Technical specification.
SUPPLY OF CONSTRUCTION MATERIAL AND PROVIDING EQUIPMENT IN GP SOONTHRA PS UNIYARA
SUPPLY OF CONSTRUCTION MATERIAL AND PROVIDING EQUIPMENT IN GP BILASPUR PS UNIRA
Multipurpose Wood Working machine (Q3) (3 (3 ))
Construction of garbage collection center in Devikheda
Garbage collection, separation, road and drain cleaning and community sanitation, campus cleaning work GP DHUVANKALAN PS DEOLI
Construction of garbage collection center in Juniya
Construction of C.C. Road from Sobhag Mali House to Jai Narayan Verma house in Ward No. 56 Municipal Area Tonk
Supply of Spares for Door & Table items for Vande Bharat coaches as per Annexure "A" , make - Southco.
Supply of One Number of Unified Notice for Fire Prevention and Safety to drg. no. TS/MC-6-4-027, Alt. "a".
Supply of Polyolefin Foam 25 mm. Thickness for improved sealing in Vande Bharat Coaches to reduce Dust entry and outside Air entry. As per ICF CAI no. A-2023/12.
Requirement Set of different type of cable for connection in data analyzer for collection WSP data of WSP system in LHB Coaches ( one set consisting of 04 types of cable, each one number) a) USB to DP9 b) USB to 3 pin circular c) USB to small USB d) LAN to 4 pin circular. All cables should be compatible with the WSP system of LHB coaches. Note Samples of each item must be approved before bulk supply.Quantity of item is attached as per Annexure.
Bracket 6X50X191 as per part no. - 18 of drawing no. ICF/SK 3-7-1-018.
WSP Junction box sensor cable mounting bracket as per Drg. no.- SKT-2026/26/C/Aii.
Construction of Minor Bridge 2 by 10 at km 40 116 at Aligarh Village and 120 m diversion on one side with 1200 mm Hume Pipe and safety boards and construction of Box Culvert 1 by 3 by 2 point 5 at km 67 200 near Y Junction of Kustala on Tonk SWM
kachra ekatrikaran, sangrahan pritthikaran evam compost ecoi kendra gram nayagaon ranipura
Cross linked Polyolefin Thermal insulation (XLPE) sheet/roll of size 1.2 mtr x 16 mtr x 25mm thick cross linked closed cell polyolefin thermal insulation foam with factory applied aluminum foil for mechanical protection for Heat and thermal resistance density 25 kg/m^3 Technical specifications as per Annexure-I, suitable Test certificate to be submit. Sample to be approve before bulk Supply.
Water Supply Scheme for Augmentation of UWSS Roopwas, Distt. Bharatpur including 5 year OnM after 1 year Defect Liability period under Amrut 2.0
Ground Nut Cake
LED Luminaire For Road And Street Lights Conforming To IS
Facility Management Services - LumpSum Based - NAGAR PALIKA DEOLI; STREET LIGHT MAINTENENCE ANNUAL RATE CONTRACT AMC WITH MATERIAL IN MUNICIPAL AREA DEOLI; Consumables to be provided by service provider (inclusive in contract cost)
Monthly Basis Cab & Taxi Hiring Services - Sedan; 2000 km x 320 hours; Local 24*7
SUPPLY OF CONSTRUCTION MATERIAL AND PROVIDING EQUIPMENT IN GP PANWAD PS DEOLI
SUPPLY OF CONSTRUCTION MATERIAL AND PROVIDING EQUIPMENT IN GP CHARNET PS DEOLI
THREE PHASE (IGBT) BASED PLASMA CUTTING MACHINE
Human Resource Computer Operator and Vehicle Driver Work
Supply of electrician for light maintenance for the year 2026-27 (under rate contract)
Construction of RCC drains at Industrial area Tonk.
Stainless Steel Window Bar and Window Support.
Construction of 2 Row HPC at Jawali Naner Road to Ibrahimpura Thata
Construction of 4 Row Box Culvert at Newai Dangarthal Road to Hingotiya
Construction of 4 Row Box Culvert at Old NH -12 KM 64 (Newai) Chainpura Dehlod Mod -Dahlod - Ganeshpura - Hathathali - Datwas Ch. 16/0
Const.of 4 Row Box Cul. Prot.Wall at Newai Bansthali Mod NH12 Km65 to Bansthali Manoharpura Churada Navrangpura Ranoli Khatmana Arniya Kak.Soda Jaisinghpura Diggi Kurthal Bacheda Malikpur Pachewar Awda Nagar Bamolav Sirong DistAjmer(Ch5/0 Banasthali)
Const.of 2Row Box Cul.Prot.Wall at Newai Bansthali Mod NH12 Km65 to Bansthali Manoharpura Churada Navrangpura Ranoli Khatmana Arniya Kakad Soda Jai.Diggi Kurthal Bacheda Malikpur Pachewar Awda Nagar Bamolav Sirong Dstt Ajmer (Ch.2/100 Banasthali)
Const. of 3 Row HPC at Newai Banasthali mod NH12 KM 65/0 to Banasthali Manoharpura Churada Navrangpura Ranoli Kathmana Arniya Kakad Soda Jaisinghpura Diggi Kurthal Bacheda Malikpur Pachewar Awda Nagar Bamolav Sirong Distt Ajmer at Ch.38/0