461 live204 closing this weekmost from TNEB Limited and Rural Development and Panchayat Raj Department
461 results • Latest
TTPS MechII BM Unit IIIStrengthening of structural supports rectification of defects in the hangers rods at 56 mtr elevation boiler roof during the overhaul 20262027
TTPS MechIIBM Unit IIIRenewal of severely eroded parent duct plate in Top side walls of APHAB flue gas outlet duct and Replacement of wornout ESP hopper lower part with hopper door renewal of wornout ESP hopper upper part and providing insulation
TTPS Mech II BM Unit III Overhauling of FD fans A B in Unit III for the year 2026 2027
TTPS Mech II AHP Unit III Annual overhauling works of valves replacement of corroded pipes of sea water Booster Pumps during the forthcoming annual overhaul
TTPSMechII BM Unit III Removal of ash accumulated over the mechanical dust collector path A B C D and ID fan A B suction side ducts and welding the eroded weld joints in the mechanical dust collector path A B C D and suction side duct of ID fan AB
TTPS Mech II BM Unit III Overhauling of ID fans A B for the year 2026 2027
TTPS Mech II AHP Replacement of Clinker grinder Feed gate assembly Power cylinders and its connected pipe lines Feed sump Hydraulic ejector assembly Regular make up jetting assembly connected pipe Lines flushing header assembly BAH structural
TTPS MechII BM Unit III Inspection Rectification of emitting electrode suspension frame in ESP during annual overhaul for the year 2026 2027
TTPS MechIIBMUnit III Patch up works in ducts including supports and fixing of guide vanes splitter in flue gas ducts of A pass Apath Bpath and B pass Cpath Dpath for the year 2026 2027
TTPS Mech II BM Unit III Overhauling of PA fans A B in Unit III for the year 2026 2027
TTPS MechIIBMUnit IIIOverhauling of load hangers of critical pipe lines headers of Boiler during the overhaul in 20262027
TTPS Mech II BM Unit III Replacement of wornout supports of Eco hoppers Inspection of Water wall Ring headers removal of debris and Strengthening of Economizer inlet header Eco intermediate header Steam cooled wall header No 8 and LTSH inlet header d
TTPS MechIIBMUnit IIIOverhauling of safety valves and High Pressure valves of Unit III Boiler during the year 20262027
TTPS Mech II BM Full reconditioning of worn out coal nozzle tips released from Unit III Boiler during 2026 2027 overhaul
TTPS MechII BM Unit III Replacement of erodedplugged Economizer coil assemblies from left end to middle area in Unit III Boiler during overhaul for the year 20262027
TTPS Mech II BM Unit III Repairing of worn-out skin casing inside the dog house and coutant bottom area in Boiler during overhaul 2026 2027
TTPS Mech II BM Unit III Replacement of boiler pressure parts tubes bends in I pass of Unit III Boiler during the year 2026 2027
TTPS MechII BM Unit III Painting of the safety valve exhaust pipes its silencers and CST tank during the overhaul 20262027
TTPS MechIIBMUnit IIICleaning of ash deposits from the headers supply tubes hangers in penthouse during the year 20262027
TTPS MechIIBMUnit IIIOverhauling of wind box and SADC in Boiler during the year 2026 2027
TTPS Mech II AHP Unit III Annual overhauling works Cleaning of Ash Water Pump House Sump during the forthcoming annual overhaul
Special Repair to Surplus weir of Eluvaraimukki Tank in Eluvaraimukki Villagae of Sathankulam Taluk in Thoothukudi District
TTPS Operation Circle CAD AOH Complete overhauling of 110 KW Auxiliary Cooling Water pump Motors of Unit III at ACWPH
TTPS Operation Circle CAD Unit IV Annual maintenance in Cooling water pump house II LT 415V AC switch gear Bus A modules, breaker and Bus coupler during the forthcoming Overhaul Period 2026 to 2027
TTPS Operation Circle CAD CWPH I Unit III Annual Overhauling of internal and external assembly and Reconditioning of C.W.P Internal spares 3B, 3C and 3D of Unit III
TTPS Operation Circle CAD Unit V Annual maintenance in Cooling water pump house II LT 415V AC switch gear Bus B modules and breaker during the forthcoming Overhaul Period 2026 to 2027
Relaying of 600mm dia DI pumping main near puliampatti village part of water supply improvement scheme of kovilpatti municipality
Dismantling of Self Help Group Building at Pitchivilai in Pitchivilai Panchayat
Dismantling of Panchayat Union Primary School at Melaarasoor in Kayamozhi Panchayat
TTPS Mech II BM Unit III Replacement of boiler pressure parts tubes bends in II pass of Unit III Boiler during overhaul for the year 2026 2027
Supply of Spares Suitable for 13 Stage Bottom Ash Water Pumps of Stage I and II
TTPS MechII TM I UnitIII Inspection overhauling of HPT IPT control valves cam shaft assemblies and Turbine bearings during the forthcoming annual overhaul
Supply of 100NB SS 316 Gr Pipe and fittings for Drain Pump B delivery line in Ash Slurry Pump House of Unit IV and V
TTPS Mech II BM Unit III Inspection overhauling and commissioning of actuators of high pressure valves in boiler during the overhaul 2026 2027
TTPS MechII TM I UnitIII Inspection Painting Overhauling of condenser cw pipelines hotwells etc during the forthcoming annual overhaul
TTPS MechII TM I UnitIII Removal of deteriorated cladding over the inner surface of condenser East West cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of
TTPS MechII TM I UnitIII Inspection Overhauling Renewal of Piston seals Piston rod packings in HPLP Bypass valves Spray valves actuators Condenser Butterfly valves actuators and Steam line valves actuators for Main Turbine system Feed water syst
TTPS Mech II BM Unit III Dismantling the existing seal plates and re erection after rectification works in BAH and overhauling of boiler fill pumps hot well makeup pumps during 2026 2027 overhaul
TTPS MechII TM I UnitIII Overhauling of steam and condensate valves of Turbine Regeneration system during the forthcoming annual overhaul
TTPS Mech II BM Unit III Overhauling of Coal oil burner and its tilting mechanism of corner 1 2 long retractable soot blower LRSB and water wall soot blower in Unit III Boiler during the year 2026 2027
TTPS MechII TM I UnitIII Overhauling of feed water tank deaerator vent condenser and overhauling of feed water valves steam condensate valves during the forthcoming annual overhaul
TTPS MechII TM I Overhauling of Air compressors in Unit I II III for the year202627
TTPS Mech II BM Unit III Overhauling of Oil Heater Assembly OHS during the year 2026 2027
TTPS MechII TM I UnitIII Conducting tube Cleaning in the inner surface of the condenser for its entire 10 02m length using a flexible hose fitted with nylon brush and fine water tube jet arrangement subsequent jet cleaning and Inspection of
TTPS Mech II BM Unit III Replacement of plugged eroded Economizer coil assemblies from right end to middle area in Unit III Boiler during overhaul for the year 2026 2027
TTPS MechII TM I UnitIII Reconditioning of Lub oil Seal oil cooler cooling water butterfly Gate valves of various sizes during the forthcoming annual overhaul
Procurement of 8 mm thick MS Plate as per IS 1730 for Flue gas Ducts and Air Preheater Ducts in Unit IV
Procurement of 8 mm thick MS Plate as per IS 2062 for Unit II ESP Inlet Duct
License to Operate Snack Bar in the Ground Floor Security Hold Area of New Terminal Building at Thoothukudi Airport
TTPS MechII AHP UnitIII Attending overhauling works in Unit III ECO APH hoppers Ash disposal system flushing apparatus Rubber expansion bellow and allied sea water pipe lines fittings valves and rectification work in APH hopper platforms and d