Loading…
Loading…
2,854 results • Recent activity
ECHP-II Clearing the coal coal dust and foreign materials daily on walkways of both side return side under belt throughout conveyors deck sheet and tail end areas monitoring cleaning and checking the mechanical equipments of conveyor 72 73 .
Maintenance of Bottom Floor and Side Wall upto 3mtr. height of RCC Chimney 1 and 2 by Water Washing for the period from 01.04.2026 to 31.03.202
Monthly Basis Cab & Taxi Hiring Services - MUV; 3000KM X 465 Hours; Local, Monthly Basis Cab & Taxi Hiring Services - MUV; 2000KM X 465 Hours; Local, Monthly Basis Cab & Taxi Hiring Services - Sedan; 1500KM X 300 Hours; Local
Construction of Storm Water Drainage Fathima Nagar 1St Street West Fathima Nagar 4th Street West Fathima Nagar 5th Street West at ward 46 in East Zone
Periodical Cleaning of the Storm Water Drains in Unit 1 to 3 including Storm Water Channel near Storm Water Pump House for the period from 01.04.2026 to 31.03.2027
Regular Maintenance of the Tree Saplings planted on the North side of Switchyard 1 for the period from 01.04.2026 to 31.03.2027