Loading…
Loading…
2,840 results • Recent activity
TTPS Mech II TM I Unit II Condenser Repairing and arresting the leak points in the longitudinal bellows and side walls of LPT Exhaust hood during the forthcoming annual overhaul
TTPS MechII AHP Plastering of refractory cement inside Unit II BAH and removal of ash slag and debris from BAH floor and trenches during the forthcoming annual overhaul
TTPS MechII AHP Painting of Unit II Bottom ash hopper body plate and its connected structural supports from 0 mtr to 6 mtr EL during the forthcoming annual overhaul
TTPS Mech II AHP Renewal of wornout South side vertical column box BAH structural supports, walkway platform with staircase around BAH seal trough and makeup valve in Unit II BAH during the forthcoming annual overhaul
Development of road and drainage facility at Coal Yard - III in VOCPA
TTPS Mech II AHP Renewal of worn out portions of Bottom ash hopper body plate connected structural supports and BAH supporting vertical columns in North East and West side dismantling and erection of BAH overflow trough and its outlet pipe lines in