Loading
Loading…
Loading…
2,840 results • Latest
Improvement works to the Drain in South side of 70 South road from Main Canteen Toilet to Dispensary at TTPS
SUPPLY OF INSULATION MATERIAL FOR UNIT I and II BOILER PRESSURE PARTS
SUPPLY ERECTION AND COMMISSIONING OF 300 NB QUICK FILLING INTERCONNECTION PIPE LINE FITTINGS FOR COOLING WATER TUNNEL OF UNIT I TO III FROM NORTH END IN CWPH I
Supply of Expansion joint of size 2800 x 4000 mm style I for Unit I and II flue gas discharge duct with M 16 x 60 mm bolt and nut full thread 120 Nos Set
FABRICATION AND SUPPLY OF ESP HOPPER LOWER PART WITH BOTTOM FLANGE AND INSPECTION DOOR ASSEMBLY FOR UNIT III ESP
SUPPLY OF COLUMN PIPE FOR COOLING WATER PUMPS OF UNIT II