Recovery and Re-construction of 4.00 M span RCC Slab Culvert at Sonai Khourang via Serfang at 1st KM road under PWD Udalguri Rural Road Sub-Division, Udalguri under NDRF(PDNA-2022) in Udalguri District for the year 2025-26
RCC SLAB CULVERT 4.00 M SPAN : Earth work in excavation for structures as per drawings and technical specifications Clause 305.1, including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Protection work at Kadabil FIS under SDMF for the year 2025-26 Udalguri Mazbat Division (Irrigation) Udalguri
De-silting of Source river
Recovery and Re-construction of Naoherua to Thakuriapara Road under NDRF(PDNA-2022) for the year 2025-26.
Construction of Embankment with approved material obtained from borrow pits, with a lift upto 1.5m, transporting to site, spreading, grading to required slope and compacting to meet requirement of tables 300.1 and 300.2 with a lead upto 1000m as per technical specification clasue 301.5. (i) Private land
Balance work for Institute of Paramedical and Nursing Sciences at Udalguri District under SDP to be funded by Govt. of Assam.
ADMIN BLOCK CIVIL WORKS EARTH WORKS 2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil
Construction of RCC G1 PS building at Tangla PS of Udalguri District Assam under MOITRI Scheme on Engineering Procurement and Construction EPC mode 1 basis Brown Field
Planning, Designing, and Construction on EPC Basis multistoried RCC framed structure building (G+1) Police Station Building under MOITRI Scheme at Tangla PS in Udalguri (R) District, with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of PMC/Engineer-in-charge of APHCL by incorporating stipulated specification and adopting NBC-2016 norms, IS Codes and guidelines complete in all respect. (including Supply/Installation of Equipment/Accessories/ Furniture etc. as per Tender Document) Note: - Plinth Area shall be measured for the actual constructed.
Steel Almirah/Cabinets (V4) (Q3) ( PAC Only ), Executive Table (V4) (Q2) ( PAC Only ), Composite Office Tables conforming To Is 8126 (V2) (Q2) ( PAC Only ), Revolving Chair (V5) (Q2) ( PAC Only ), Chair for General Purpose (Q2) ( PAC Only ) (3 (3 ))
Steel Almirah/Cabinets (V4) (Q3) ( PAC Only )