Loading…
Loading…
5,638 results • Latest
BOQ
BOQ
BOQ
BOQ
BOQ
BOQ
Construction of Toilet Complex at Govt Middle School
Construction of Toilet Complex at Govt Higher Sec School
Construction of road from Tawi bridge Ramnagar road to Chigla gair roun domail W.No. 06 Udhampur (3rd Call)
Providing Design and Structural Consultancy for- 1) Const. of 10.0 mtr span motorable bridge on CEO Office to Omara to Battal Ballian Udhampur (under NABARD), 2) Const. of 23.0 mt span single lane motorable bridge on neeli nallah mandir (2nd Call)
Construction of Additional Room and Lavatory at Naibat Office Tikri. (Prefabricated Structure) (under UT Capex Budget 2026-27) (2nd Call)
construction of lane by way of laying tile work from house of Sh. Virender singh to onwards at wno.9 kambal danga (phase 1st)
PLEASE REFER TO BOQ
Construction and Maintenance of Road from L133-(Link Road) Bagta to Upper Dadura Package No. JK20-4037, PMGSY-IV, Batch-I of 2026-27, Block-Panthal, District Reasi. (Using Waste Plastics 3.500 Kms) Length 3.500 Kms
Construction of road from Palli to Sunari via Palara
PLEASE REFER TO BOQ
Boundary wall of community hall at Mahatma Rasila Ram Vedic Vanaprastha Anand Dham Mounngrali, panchayat kambal danga
PLEASE REFER TO BOQ
Upgradation of Gandala Bali road (L 2.00 km)
PLEASE REFER TO BOQ
Construction of Niabat Office Lander Udhampur
PLEASE REFER TO BOQ
CONSTRUCTION OF ROAD FROM JIB Peer Baba Palah Danga to Kambal Danga Sunari road
Construction of road Chompal Nallah W. No. 9 Village Ser Jaganoo
Construction of Patwar Khana at Kultyar Panchari Udhampur
SPL REPAIR TO BLDG NO NP17 NP23 AND NP40 UNDER AGE BRI AND REPAIR REPLACEMENT OF CERTAIN BER SUMMER WINTER APPLIANCES UNDER GE SOUTH UDHAMPUR
Macadamization of various roads in Sub Division Udhampur for the year 2026-27 (Under City and Town roads) Part A- Macadamization in Ekta Vihar. Part B - Macadamization of road from Raja Mandlik to Bheem Devta W. No. 7.
Macadamization of various roads in Sub Division Udhampur for the year 2026-27 (Under City and Town roads) Part A - Macadamization of road from NH 44 to Kareya Garnai Phase-I. Part B - Sumberoa Dugli Mohalla to Khund Krata Shoket Shop.
Macadamization of various roads in Sub Division Udhampur for the year 2026-27 (Under City and Town roads) Part A- MACADAMIZATION OF BALNAGAR ASHRAM ROAD INCL. BALANCE PORTION OF BALNAGAR FANTYAL ROAD and KHADAJ BOWLI REASA.
Macadamization of various roads in Sub Division Udhampur for the year 2026-27 (Under City and Town roads) Part A - Macadamization of city road in various stretches of Udhampur City from Venus Chowk via Sallian Talab via Main Bazar via dibber
HP OMNI BOOK X FLIP LAPTOP NGAI 14-fm0100TU
Toner Cartridges/Ink Cartridges/Consumables for Printers (Q2), Plotter Paper Roll (V2) (Q3) (3 (3 ))
Detergent, Diluent 20 ltr, Lyse FBH 500 ml, Lyse FDOI 500 ml, Lyse FDTI 500 ml, Serum Bilirubin, Serum ALT, Serum AST, Serum Alkaline Phosphate, Serum Total Protein, Serum Albumin and AG Ratio, Blood Urea, Serum Uric Acid, Serum Creatinine, Glucose Tolerance Test, Blood Glucose, S total Cholestrol, Serum S Triglycerides, S. HDL C, S. LDL C, Blood Grouping and Rh Typing, Urine Pregnancy Test Kit, Urine Albumin And Glucose, RK39 test for Kala Azar, RA Factor Kit, Widal Test, Malaria Rapid Test, Dengue, HIV, STS, Hepatitis B, Hepatitis C, Urine Strips 2P, EDTA Tube, Plain Tube, Water Testing for chlorination Strips, Water Testing for Faecal contamination, Micro Pipette 100 micron litre, Micro Pipette 1 micron ltr 100 micron ltr, Micro Tip 1 -100 micron litres, Black Test Tube, Sputum Cups, Methnol, Buffer, Oil Immersion, Methylene Blue, Hypochloride, Gram Staining
Construction of road from Baba Mahadev Mandir at Village Barneak (Phase-I)
BOQ
BOQ
BOQ
BOQ
BOQ
BOQ
BOQ
BOQ
BOQ
BOQ
BOQ
BOQ
BOQ
BOQ
BOQ