Loading…
Loading…
357 results • Latest
PROJECT MANAGEMENT CONSULTANCY FOR BUILDING WORKS OF UDA, AT UJJAIN
Selection of System Integrator SI for Establishment and O and M of Integrated Command and Control Centre ICCC for Simhastha Kumbh Mela 2028
Selection of System Integrator (SI) for Establishment and O and M of Integrated Command and Control Centre (ICCC) for Simhastha Kumbh Mela 2028
Construction of 4 L of Ujjain Jhalawar Sec of NH 552G from Ch.0.000 Village Khilchipura to Ch.86.500 Village Aakli Kadiya (PKG 1) in the State of Madhya Pradesh on EPC Mode under NH(O).
Construction of 4L of Ujjain Jhalawar Sec of NH 552G from Ch.86.500 Aakli Kadiya to Ch.159.263 Jhalawar (Jn with NH52) PKG 2 in the State of Madhya Pradesh and Rajasthan on EPC Mode under NH(O)
Consultancy Services for AE for Supervision of Construction of 4-Lanning of Ujjain-Jhalawar Section of NH-552G from Ch.86.500 Village Aakli-Kadiya to Ch.159.263 Jhalawar (Junction with NH52) (Package-2) in Madhya Pradesh and Rajasthan EPC NH(O)
Consultancy Services for AE for Supervision of Construction of 4-Lanning of Ujjain-Jhalawar Section of NH-552G from Ch.0.000 Village Khilchipura to Ch.86.500 Village Aakli-Kadiya (Package-1) in Madhya Pradesh on EPC Mode under NH(O)