Loading…
Loading…
116 results • Latest
Work contract for Routine maintenance of ESP of Unit No. 1 to 4 of PH I and II at SGTPS, MPPGCL, Birsinghpur.
Procurement of Collecting Electrode of ESP for Unit no. 2, SGTPS, MPPGCL, Birsinghpur
Procurement of Temperature Controller for Turbine Lube Oil Temperature Control and Alarm Monitor for Stator Water and Seal Oil System value Monitor of Unit No. 1 and 2, PH I at SGTPS, MPPGCL, Birsinghpur.
Annual rate contract for rewinding of 3-phase, 415 V LT motors pertain to EMD-III division of 500 MW unit, at SGTPS, MPPGCL, Birsinghpur.
Procurement of Silica Sand for Gravity Filter and Mechanical Filter of DM WT plant for Unit no. 1 to 4 and Sodium Silicate of Specific Gravity 1.6 Liquid Glass for Unit no. 1 to 5,at SGTPS, MPPGCL, Birsinghpur.
Procurement of Carbon Steel fins for casing for Boiler of Unit No 1 to 4, PH-I and II, SGTPS, Birsinghpur.
Procurement of HEA Igniter System for Unit no. 5 , 500 MW ,SGTPS, MPPGCL, Birsinghpur.
Procurement and Erection of Rigid Type Discharge Electrode with Fixing Clamp arrangement in two field of ESP of Unit no. 2, SGTPS, MPPGCL, Birsinghpur.
Procurement, Installation and commissioning of new elevator in mill area at Boiler side between Unit No. 1 2 of PH I and Unit No. 3 4 of PH II at SGTPS, MPPGCL, Birsinghpur.
Work contract for complete overhauling along with commissioning of 02 nos. Hayward Tyler make 6.6kV, 360KW glandless Boiler Circulating Water (BCW) pump motor installed at 1x500MW unit, at SGTPS, MPPGCL, Birsinghpur.