Loading…
Loading…
115 results • Latest
Work contract of Routine maintenance of boiler firing and coal feed system, complete fan group along with LOP system, HP LP dozing system and fuel pressuring HFO and LDO pumps system of unit no. 1 to 4 of PH I and PH II at SGTPS, MPPGCL, Birsinghpur
Upgrading, testing and commissioning of NGR systems to 3.3 KV, 10 Amps, 190 Ohms from present 3.3 KV, 38.1 Ohms, 50 Amps at different units of Johilla Area, SECL.
NIT SCHDULE FOR STRENTHENING OF NIPANIYA TO SALHE TOLA ROAD LENGTH 3.00 KM.
NIT SCHDULE FOR STRENTHENING OF SEETAPAL TO MAJHAULI ROAD LENGTH 3.20 KM.
NIT SCHDULE FOR STRENTHENING OF MAHAMAN TO MAIRY ROAD LENGTH 5.50 KM.
Annual work contract for Servicing and maintenance and stamping of 02 no. electronic weighbridge capacity of 100 MT installed at silo area of 4X210 MW and 1X500 MW at SGTPS, MPPGCL, Birsinghpur.
Enquiry for Hydraulic testing replacement of valve and refilling of different of different capacity Co2 cylinder at SGTPS, MPPGCL, Birsinghpur.
Procurement of special purpose consumables Stag B Steam Seal Compound Type Red required for overhauling of TG set and TG auxiliaries of units 1 to 4, SGTPS , MPPGCL, Birsinghpur.
Enquiry for Procurement of PVC HDPE High Density Double Lined Bags for Coal Testing Laboratory O/o S.E. (Ser)-II at SGTPS, MPPGCL, Birsinghpure.
Cleaning Items