Loading…
Loading…
Found 3 active tenders
3 results • Latest
PROVN OF SOLID WASTE MANAGEMENT PLANT AT BORARUPAK MIL STN
Excavation in post holes (or similar holes) each not exc 0.5 Cum and getting out, returning filling in and ramming earth or borken rubble mixed with earth around in layers not exc 25cm watering and removing surplus spoil to a distance not exc 50m and making good surface in soft/loose soil all as specified and directed.
construction of 02 Nos wooden Huts having size 20x30 ft in Meni Valley of Daporijo axis (Approx 50 kms from the last road head) in the AOR of 10th BN ITBP
Geological exploration by extension of 02 nos. existing drift of size 1.8x2.1m , RDR-2 by 100m length at EL293m and RDR-3 by 150m length at EL 418m at Right Bank with 04 nos. Head room or working space (02 nos. on each Drift) of size (5mX4mX4.5m) fo
Geological exploration by Extension of 02 Nos of existing drift