Loading…
Loading…
756 results • Recent activity
Naturally Ventilated Poly House (Q3) (3 (3 ))
Video Recorder for CCTV System (V2) (Q2), Layer 2 Access Switch (V2) (Q2), Fibre Cable for Networking (Q3) (3 (3 ))
Video Recorder for CCTV System (V2) (Q2), Camera for CCTV System (V3) (Q2)
Air conditioning test Rig, Experimental Refregeration test Rig, Experimental Cold storage test Rig, Cascade Refrigeration Test Rig, Domestic Refrigerator test Rig, Experimental split AC test Rig
Video Recorder for CCTV System (V2) (Q2), Layer 2 Access Switch (V2) (Q2), Fibre Cable for Networking (Q3) (3 (3 ))
DC Regulated Power Supply (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2026/B/7101492 Dated : 21-01-2026 Bid Document 1/8 Number of Auto Extension count 3 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank HDFC Bank (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 12 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Principal GEC, Valsad, Nr. Sanskar Kendra, Tithal Road, Valsad-396001 (Government Engineering College Valsad) (Principal Government Engineering College Valsad)