Loading…
Loading…
671 results • Latest
25 KV Electrification work in connection with Provision of Ramp for FOB at various station of under jurisdiction of Sr.DEN-III/BSB (GYN, DLR, JKN, SDT, SRNT (total-05 station), BSB division of N. E. Railway.
25 KV Electrification work in connection with proposed construction of 4 - lane ROB at Railway Km 7/26-24 between Peokol & Salempur station in Bhatni - Aunrihar section in Varanasi Division (NH CH 2+645) of N.E. Railway.
Repair and Modification of Extractive Metallurgy Division (EMD) and renovation all toilets of workshop area in Department of the Metallurgical Engineering, IIT(BHU), Varanasi.
Renovation of IWAN Laboratory, flooring of the portico, renovation of security Lab, T(I.T.E.S.) Lab and removal of the partition near HoDs chamber in Dept. of Computer Science and Engineering, IIT(BHU), Varanasi.
Design, Fabrication, Installation, Commissioning, Operation, Maintenance and Advertisement Rights of 20 Double-Sided Backlit Unipoles (10000 Sq.ft.) on Build, Operate and Transfer (BOT) Basis
Selection of Agency for Design, Fabrication, Installation, Commissioning, Operation, Maintenance and Advertisement Rights of 15 Double-Sided Backlit Unipoles (7500 Sq.ft.) on Build, Operate and Transfer (BOT) Basis
GOVERNING ASSEMBLIES RACK
Mineral Mixtures For Supplementing Cattle Feeds
Hiring of Sanitation Service - Manpower Based Model - Sweeper; 6; All Areas; All Areas; Daily; 2