Loading…
Loading…
895 results • Latest
Construction And Instalation Of High Mask Girls School kashighat ground in girls hostel ward 19 sironj
Construction of Boundry wall shree krishna goushala at ward 21 sironj
construction and installation high mast sironj
BOUNDARY WALL AND GATE AT EXTENSION MANDI YARD GANJBASODA
Construction of 500 Seater Multipurpose Hall, 50 Seater Girls Hostel, 50 Seater Boys Hostel, 6 F-Type Plus 4 H Type Quarter, Landscaping Works at Govt. Polytechnic College, Sironj, District Vidhisha (M.P.)
Construction work of C.C. Road at ward no 25 vatsalya school gate to vinayak bag Colony vidisha.
Construction of Vidisha Railway Station Madhav Ganj Chouk Main Road to Pedi School, Chanakya road to Bajariya Jhaki Chouk Via Shivaji Chouk length 2.30 km. PAC 663.82 lacs 12th Call on Road and Bridge SOR 11-04-25 work period 300 days I/c rainy s
Construction Work of 03 Sub Health Center with CHO Quarter Electrical Work Sanitary Fitting Tubewell Boundary wall Village Bauliya Tal Block Sironj, Dafarayai Block Nateran, Pipraha Block Vidisha at District Vidisha Second Call
Construction Work of 04 Sub Health Center with CHO Quarter Electrical Work Sanitary Fitting Tubewell Boundary wall Village Shekpura Block Kurwai, Jawati Block Lateri, Kodiya Block Sironj and Karariya Block Vidisha at District Vidisha Second Call
Ward No. 26 Royal City Tin shed and platform repair work in big park vidisha.
Construction of H-Type Multistorey 4 Nos. Quarter At Jail Campus for Jail Department At Ganj Basoda.
Construction work of asphalt road at ward no 33 aambali colony smadhi to govt. school
regarding the aouction of shop construction at the new sabji mandi ward 2 sironj shop 23
Construction work of RCC Drain at ward no 27 from Ramdwara main road rahuvanshi house to munna lal jain house vidisha
Balance Work of Survey, Investigation and Necessary Construction works required for Execution of Single Village based New PWS Schemes of Villages - PIPALKHEDA KHURD, AAMACHHAR, LALAKHEDI AND KHAJURI BARRO of VIDISHA Block Distt. Vidisha
Regular inspection Maintenance Greasing chlorination water sample collection and other allied maintenance work 1920 handpump of 301 villages in Block-Sironj, Distt.Vidisha for 01 Years.
Supply of Hydrovac sets and Desludging vehicle machine in under SBM vidisha Municipality.
Construction work of C.C. Road at ward no 34 kariya kheda gali no 03 netram dhakad to hemant yadav house vidisha
Construction work of C.C. Road at ward no 04 jain mandir to dushyant jain house vidisha
Construction Of CC Road From Maksudangarh Road To Saraswati Shishu Mandir At Ward Number 01 Lateri
Construction Of CC Road From Cloth Market Main Road To In Street Of Agrawal Samaj Shri Jankinath Mandir At Ward Number 08 Lateri
Construction Of CC Road From Parma Kakka Tubewell To Shivam Sharma House At Ward Number 12.
Providing and Fixing Road Safety Appurtenances work on road under Shamshabad Sub. Division No.2 Vidisha
Providing and Fixing Road Safety Appurtenances work on road under Sub. Division Vidisha H.Q.
Providing and Fixing Road Safety Appurtenances work on road Kuakhedi to Gulabganj length 20.00 km.
Construction of H-Type Multistorey 4 Nos. Quarter At Jail Campus for Jail Department At Lateri.
Construction of an RCC drain from Ashoks house to Anils house in Ward 04
Construction of an RCC drain from Santoshs house to Rajas house in Ward 04
Strengthening work of Teelakhedi to Gehukhedi road length 1.70 km. and Devkhajuri to Gulabganj road length 2.00 km. total length 3.70 km.
B.T. Renewal work on Karariya Shamshabad road km. 19 to Kashipur Bawdi road length 3.00 km. IIIrd Call.
Construction of C.C. Road From Neemtal Chouk to Tilak Chouk, Mayur News Office to Bada Bazar road length 1.10 Km.
Strengthening work of Shamshabad to Kotra Namakhedi Kothichar Kala Sukha Semra road (Sankalkheda Pureniya to Gangarwada Semra Approach road) length 5.60 Km.
Strengthening work of Kothichar Approach road length 2.00 km., Khamkheda Bamankheda Banskheda length 2.00 km. and Khamkheda Lodhakhedi Gangarwada road length 3.00 total length 7.00 km.
Strengthening work of Sukhaneekheda Parasigujar road length 5.50 km.
Strengthening work of Pauwanala to Chatuauwa road length 7.00 km.
Strengthening work of Cheerkheda to Neemkheda road length 3.50 km.
Strengthening work of Kolinja Chakk to Vidisha Ashok Nagar road length 2.20 km. and Konlinja Approach road length 2.10 km. total length 4.30 km.
Construction work of C.C. Road at ward no 02 ayodhaa nagar khusi mehal to warehouse vidisha
Construction work of C.C. Road at ward no 39 Teelakhedi RMP nagar phase -1 Ram tiwari to sp chatruvedi and pawan patel to raghunath prajapati .
Construction work of RCC drain at ward no 22 various streets
Repairing Maintenance Work of Water Proofing work of various lift at Atal Bihari Vajpai Govt. Medical College Vidisha. IInd Call
White Washing, Colour Washing and Other work of Residential and Non Residential Govt. Building in Lateri Section under PWD Sub Dn. Sironj.
Construction work of RCC drain at ward no 22 hospital road patrol pump to agrawal darmshala .
White Washing, Colour Washing and Other work of Residential and Non Residential Govt. Building in Sironj Section under PWD Sub Dn. Sironj.
Construction work of C.C. Road at ward no 03 sunil dhakad to lakhpati jain house vidisha
Construction work of RCC drain at ward no 02 ayodhya nagar various streets vidisha
supply of sanitary items at distrcit jail vidisha
PROVIDING CHANGEOVER OTHER ELECTRICAL PROTECTIVE GEAR FOR GROUND FLOOR ELECTRIC PANEL ROOM AT COLLECTRATE NARMADAPURAM DISTT NARMADAPURAM
Strengthening work of Gram Jhirniya Sultanpur road to Baniyakhedi Marg length 4.60 km.
Strengthening work of Durga Nagar Sarswati School to Gurariya Chidoriya Bhoriya road length 6.30 km.