1,225 live747 closing this weekmost from Department Of Military Affairs and GREATER VISAKHAPATNAM MUNICIPAL CORPORATION
1,225 results • Latest
Marine and Transit Insurance Service - Marine Cargo Inland, Marine/Inland open cargo Policy; Land, Sea, Air
Selection of Private Partner for Setting up of Solar Power Plant of 15MW capacity for captive use of Greater Visakhapatnam Smart City Corporation Limited in the state of Andhra Pradesh on PPP mode
Laying of complete earth mat with 75X8mm, 100X16mm MS flat in place of old earth mat and providing new earth pits, 32mm dia MS earth rods into 3m depth,connection of equipment, structures to newly laid earth mat at 132KV Prathipadu SS under RMI 23-24
Strengthening of earthing in 220/132/33KV Tekkali SS (more than 20 years old) to maintain proper grid stability under RMI 23-24
Supply and Fabrication of SS Q lines temple inside and CC Flooring at Uphill
Strengthening of earthing for maintaining proper grid stability by providing 32mm dia MS earth rods into 3m depth and laying of 75X10mm, 100X16mm MS flat in place of 53 years age earth mat in 132KV SS Peddapuram under RMI 23-24
PROVIDE CC FLOORING, CC ROAD REPAIRS, FOOT PATH TILES, TOILETS FLOORING REPLACED DAMAGED AREA AND CIVIL REPAIR PATCH WORKS AND OTHER NECESSARY WORKS ETC., FOR A PERIOD OF 6 MONTHS FROM AGREEMENT AT UPHILL
Construction of GI Roof Sheet Shed of Size 60' (L) x 40' (W) x 5' (H) for Installation at Nrusimha Sadhan Building
Construction of Toilets near Padalamma Temple, Uphill
Providing GI Poles with Galvanized Iron Barbed Fencing of Length about 1100M near Toll Gate from Pole No 15 to 56
Construction of Tensile Fabric Roof Shed of size 100' (L) x 20'(W) x 12'(H) at one stop centre and provision of Tensile Fabric Roof Sheds on the South and West sides of the Cold Storage Building for the Gas Store of size 40' x 20' and the Pindi Mill size 60' x 30'
Constructions of Toilets, Septic Tank and Rising of RR Masonry East side of Temple at Up Hill and Construction of RCC Wall at Lovathota Hill Side
Providing Precast Compound Wall at Various Locations in Devasthanam vacant Lands in Survey No. 275
Repairs of Drain, Pathway and Other Maintenance works at Flower Garden
Improvement to View Point near Y-Junction of the Ghat Road
Construction of Toilets at Gajapathi Cottage, Uphill
Formation of CC Road of Length about 65M for EO Guest House at Old Gosala
Procurement of Stg1 AWRC pump at NTPC Simhadri
Supply of IBR AS Pipes
SETTING UP OF HYDRAULIC BOAT REPAIR FACILITY ENGINEERING DIVISION
REPAIR/MAINTENANCE OF MISC ARTICLES OF FURNITURE UNDER GE (NB) VISAKHAPATNAM
8735 Maintenance Repairs replacement to certain parts of cooling appliances split window type air conditioners water coolers refrigerators and deep freezers at NSTL under AGE I R n D NSTL Visakhapatnam
TECHNOLOGICAL ASSISTANCE IN CMS/ESF
Supply of IBR and NON-IBR CS Pipes
Repairs and maintenance of existing Motors and Panel Boards for the 3Nos of Pump Houses i.e.,Vepagunta,Banta colony and Jangala Colony in 9 Merged panchayats of GVMC for the year 2026-27.(period of 6 months)
Repairs and maintenance of existing Motors and Panel Boards for Block-24, Sivanagar & Laxminagar Pumphouses, Gopalapatnam in Zone-VIII of GVMC for the year 2026-27. (period of 6 months)
Repairs and maintenance of existing Motors and Panel Boards for the 3Nos of Pump Houses i.e Ganeshnagar Prakashnagar and Rathicheruvu in Zone-VIII of GVMC for the year 2026-27. (period of 6 months)
Repairs and maintenance of 630 KVA and 315 KVA Transformers at Vepagunta and Ganesh Nagar Pump Houses in Zone- VIII of GVMC for the year 2026-27. (period of 6 months)
REPAIRS OR REPLACEMENT OF STEEL DOOR WINDOWS GATES ROLLING SHUTTER COLLAPSIBLE GATES AND OTHER ALLIED WORKS UNDER AGE BR I OF GE ND VISAKHAPATNAM
TERM CONTRACT FOR ARTIFICER WORKS AT NAD AND ABE PARK UNDER AGE BR II OF GE ND VISAKHAPATNAM
TERM CONTRACT FOR ARTIFICER WORKS AT DEGA VIHAR AND INS DEGA UNDER AGE BR II OF GE ND VISAKHAPATNAM
Repairs for SW Drain and laying of Cover slabs from Venkojipalem Hanuman statue to Hanumanthwaka junction in ward no 15 of East Zone, GVMC-2nd call
Construction of RCC Retaining wall at D.No.3-424/1 at Adarsha Nagar Hill Top in ward no 10 of East zone of GVMC-2nd call
Renewal of BT surface by hot mix process to speed breaker portion at Venkojipalem junction in East Zone, GVMC-3rd call
BT Hot Mix patches at various places in Ward No.28 of East Zone, GVMC-2nd call
Construction of RCC Ramp to the existing gedda behind Shankar eye foundation at NTR Statue, Mangapuram colony in ward no 22 of East zone of GVMC-2nd call
Laying of CC Drain and RCC culvert in Ukku kalavedhika in Ward No 15 of East Zone, GVMC- 2nd call
Supply delivery and erection of 6Mtrs poles and street lights at Dharmanagar and various locations in ward no.55 North Zone GVMC. (Reserved for SC/ST Individual/ Co-operative Societies contractors).
Supply of voith coupling and its gear pump complete assembly for AshSlurry Pump of ST II for NTPC KORBA
PROCUREMENT OF CAPITAL SPARES FOR MDBFP VOITH COUPLING R16K600M FOR NTPCSIPAT
Procurement of Conveyor Gearbox assemblies and spares from OEM for CHPNKSTPP
Procurement of Fluid Coupling for Ball Mill Of NTPC Kudgi FGD system.
Providing 500 Mbps Internet Leased Line (1:1) connectivity for Load Balancing and Network Redundancy at the Main Office and 10 Nos. of Zonal Offices of GVMC for a period of 24 months, including maintenance of associated network devices.
Providing extension of UGD network in mattavenkatappyyya veedhi, chinnammavari street, gandhi bommaand Replacement of existing blocked UGD pipe lines in Ward No.38 under AE-12 Section of South Zone, GVMC.
Technological Assistance for operational works in finishing and shipping areas of LMMM, Part-3
CS as IE during Operation and Maintenance for supervision of 6L Korlam-Sabbaavram from Km.421.100 to Km.445.100 (Pkg-03) from Km.445.100 to Km.464.662 sec. of NH-130CD under Raipur Visakhapatnam EC in the state of AP on Hybrid Annuity Mode.
CHIPPING, BUFFING AND PAINTING OF CIC WET BILGE, ANTENNA BILGE AND FWD AND AFT WC AREA