Loading…
Loading…
59 results • Latest
Fire Resisting (Insulating) Filing Cabinets (FRFC) as per IS 14561 (Q2) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years of Experience and Turnover No
Fire Resisting (Insulating) Filing Cabinets (FRFC) as per IS 14561 (Q2) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years of Experience and Turnover No
Investigation Survey Design Engineering Procurement Construction Testing and Commissioning of Faecal Sludge Treatment Plants FSTPs based on Nature Based Technology Planted Drying Bed System in various mandals of Vizianagaram District in the State of Andhra Pradesh
Reconstruction of Temple of Sri Rama Mandiram, Kotipalli(V), Badangi(M), Vizianagaram District
Providing Drinking water facilities to Penasam village in Gantyada Mandal
Earth work excavation for pipe line trences (2/3 machinery and 1/3 manual) in all soils except rocky soils including lowering, laying and jointing of pipes with required fittings/specials true to alingment and gradient, refilling with already excavated earth, watering, tamping and removing surplus earth and testing to required hydraulic test pressure etc. complete for finished item of work of 1.00 Rmt of with the rate is inclusive of Contractor's Profit @ 13.615 % for 75mm dia HDPE PE-100 6Kg/cm2
Providing Drinking water facilities to the Sai Nagar colony of Gantyada Mandal
Earth work excavation for pipe line trences (2/3 machinery and 1/3 manual) in all soils except rocky soils including lowering, laying and jointing of pipes with required fittings/specials true to alingment and gradient, refilling with already excavated earth, watering, tamping and removing surplus earth and testing to required hydraulic test pressure etc. complete for finished item of work of 1.00 Rmt of with the rate is inclusive of Contractor's Profit @ 13.615 % for 75mm dia HDPE PE-100 6Kg/cm2
Providing Drinking water facilities to BC Colony ( Gollapeta) in Chinnakada village Chinnakada GP in Dattirajeru Mandal
Drilling of Bore well by down the hole hammer drilling to a finished dia of 112/165 mm dia in all formations suitable for down the hole hammer drilling such as medium hard rock formation to hard rock formation, all consolidated formation etc. and drilling in over burden to dia not less than 200 mm etc and reaming the bore well to suit insertion of suitable casing pipe etc., including insertion of casing pipe with couplings, caps any other relevant materials upto required depth as directed by the department including transportation of drilling rigs and supporting vehicle and including bore development (Flushing of Bore Well at an average pressure of 150 PSI) conducting yield test, consumables charges, Crew charges required in fixation of pipe assembly completely done to the satisfaction of the department and including all labour charges but excluding all taxes, the cost of casing pipe, couplings, cap etc., The entire work should be carried out as per IS -2800 Part I & II 1979 and amended from time to time.