Loading…
Loading…
1,203 results • Recent activity
CONSTRUCTION OF BAUDHA VIHAR AT LAHAN ARVI TALUKA ASHTI, DIST. WARDHA
Under Swachh Bharat Mission (GP) Phase-2, Liquid Waste Management at Gram Panchayat Sindi (Meghe) Ta. Wardha Dist. Wardha
Under Swachh Bharat Mission (GP) Phase-2, Liquid Waste Management at Gram Panchayat Warud Ta. Wardha Dist. Wardha
Construction Addition Structure on Right Bank Main Canal RD 1.0 km to RD 4.88 km, Tail minor on L.B.C. RD 1.0 km to 3.03 km and Wani minor RD 1.0 km to 1.41 km of Shirud Minor Irrigation Project
Solid Waste Management At Inzapur For 11 GPs Ta. Wardha Dist. Wardha
Supply, Fabrication, Laying, Fixing, and Welding of the earthing network using 50mm width, 5mm thick GI strips (min 80 microns quality). A provision for taping of earthing in every 10 meters will also