Loading…
Loading…
1,239 results • Latest
EGP/LRRP LAC-1563/2024-25 Odayod Mankolly Ambedkar RoadEdavaka GP - Mananthavady BP - Wayanad District, 4000000
EGP/LRRP LAC-234/2024-25 Thonichal Kandakarnnankolly Road- Edavaka GP-Wayanad District- 3500000
RETENDER Mananthavadi Municipality Pro No 172-2024-25 Mootrakolli Puthiyidom Road Retarring
This proposal is for constructing building for D Block with DDMA complex, the building proposed consists of Gplus4 floors with Total Built-up area of 4198.2 square meter. Each Ground floor and first floor having 835.8 squre meter
electrification
ELECTRIFICATION
pile, pile cap ,grade beam ,plinth beam ,column , First floor beam slab , outer wall and lintel ,floor tile work, plastering ,paining tile work and retaining wall along grid 1
Structure Two storied RCC framed structure with solated,combined ,raft footing ,as per structural design obtained from PWD design wing column, plinth beam, slab, stair case etc. using M30 Design Mix concrete nominal mix using graded broken stone
KIIFB Projects Construction and Improvement of the Infrastructure at the Elephant Rehabilitation Centre, Muthanga, Wayanad Wildlife Division, Wildlife Circle, Palakkad - General Civil Works
Grey Water Management Project 2025-26 DEWATS Premetric Hostel For Girls - Thariyod GP - Wayanad dist.-
-PROJECT NUMBER 744-SULTHAN BATHERY MUNICIPALITY 2025-26 CONSTRUCTION OF SAMSKARIKA NILAYAM AT KARIVALLIKKUNNU IN SBY MUNICIPALITY
Supply,Installation,Testing and Commissioning of Monocular Microscope at the Dept. of Botany
DEPOSIT GCNW- Construction of Toilet Block in Govt college of Nursing Mananthavady Wayanad District-work-General Civil Work
GENERAL-MLA - SDF 2025-26 Construction of Dining hall for Little Flower UP School, Mananthavady.-Work-General Civil Work
AAnnual Plan-747-2025-26-SULTHAN BATHERY MUNICIPALITY DIVISION 2- H M C PARAYIL VATTANCHIRA ROAD AND MATTATHIL BABY ROAD CONCRETE COMPLETION
Annual Plan-Electrification of Karuvallikunnu MCF RRF Building -Sulthan Bathery Muncipality-Proj No-S0839/25-General Electrical Work
Electrification of Sarvajana School at Sulthan bathery muncipality Wayanad
Letting out Space on monthly revenue share basis for running of entertainment activities such as Childrens pedal boat, Bull riding game, Zorb Ball, Trampoline, Bouncy Castle, etc at Banasurasagar Hydel Tourism Centre for a period of 2 year
Running Contract(25-26)-Mace. of CWSS to Sulthan Bathery-Noolpuzha-Muttil- Leak rectification and other works in Muttil GP
GENERAL-Reconstruction of damaged parapet and painting the building of Govt. Vocational Higher Secondary School (THS), Sulthan Bathery.-in Wayanad District.-General Civil Work
INDIRA GANDHI VANITHA P A R I S H E E L A N A K E N D R A M ELECTRIFICATION EDAVAKA GP-PROJ NO S0567/26-General
401/23-24-Earth filling in Chayimmal athiyora road in ward 1
Project.No.437/23-24-SEENAYI KANDATHIL RATION SHOP ROAD- TARRING
-Project. NO.430/23-24-Kallodi-Pulinjabetta Puthusserikunnu Road Re tarreing and Culvert in Ward-1
Pr.NO 440/23-24-Sewage collection and Disposal at Dwaraka Ayurvedha hospital
Project.No.424/23-24-Kundoni Smasanam Side protection and compound wall
Pr.No 419/23-24-Completion of maintenance to Peenchengode Anganvady in ward 12
153/23-Ayilamoola kochattu vayal road re taring in ward 19,RS. 500000
352 AYUSH HOMEO DISPENSARY RENOVATION ELECTRIFICATION
EGP 2025-26 PNo 451/26 Valeri Subcentre Plumbing Drinking Water Ward 19 Edavaka GP-MGNR-Rs 350000
EGP 2025-26 Pr No 248/26 Valeri- Ellumannam Subcentre Plumbing and Water connection Ward 2,19 Edavaka GPMGNR 200000/
EGP/ PNO 61/24-25 Thonichal kandakarnamkolly road retarring in ward 8 ,RS400000/ Edavaka GP
P.No.191/23-24-AMMBEKAR ODAYODE ROAD DRAINAGE
Project.No.435/23-24-Construction of Compound wall and Yard interlock For Kallodi Anganvady
GENERAL-General 2024-25-Renewal of Footpath between km 0/000 to 0/150 LHS and 0/000 to 0/350 -RHS of Mananthavady- Kandothuvayal Road General civil work- General Civil Work
Annual Plan-Edavaka GP Pr.No 142/23-24- Pallikal aniyaaramkolly road concrete in ward 17 Rs150000/-(own)-General Civil Work
Annual Plan-Edavaka GP Pr.No 136/23-24- Palamukk Avaran colony road concrete RS 250000/-(own)-General Civil Work
Annual Plan-Edavaka GP Pr No 109/23-24-Mannath Footpath Concrete in ward 12-Rs200000/- (OWN)-General Civil Work
EGP 2025-26 -Electrification of Ayurveda sub center_edavaka GP-proj no 512/26-General Electrical Work
EGP 2025-26 -ELECTRIFICATION OF F H C WOMEN REST ROOM_EDAVAKA GP PROJ NO 260/26-General Electrical Work
Pr.No 93/23-24- Construction of Koliyeri colony footpath in ward 11
PRO NO.438-CHAVAKKADAN IBRAHIM ROAD CONCRETE
Electrification of Kurisinkal Unnathi Padana Veed Edavaka GP-proj no274/26-
PRO NO.165-THENERI KAIPPADAM ROAD RE CONCRETE WARD 7
EGP-PNO-542-2024-25- kurishinghal sinnai kammana road rennovationward 10- Rs 500000/ Retender SO -358
Annual Plan- Edavaka GP Pr.No 115/23-24- Pilakkandi Nagathankavu road concrete in ward 8 RS150000/--General Civil Work
Annual Plan/ VGP 2023-24/ PRJ 336/ PONNARAMKUNNU DWSS/TFC 6 L/ WARD-10/CONSTRUCTION OF WELL General Civil Work
Annual Plan-Edavaka GP Pr.No 141/23-24- Kammom Mamattamkunnu Beerali Abdhulla road concrete in ward 17 Rs150000/- (own)- General Civil Work
EGP-2025-26 Pr No 225/26 Kambiline Road Maintanance WARD 11 Edavaka G P-Maintenance Fund (MGR)Rs 300000/
EGP 2025-26 -Electrification of Health and wellness centre under FHC edavaka_edavaka GP-proj no S0556/26-General Electrical Work