Loading…
Loading…
3 results • Latest
Design, Supply, Installation, Testing and Commissioning and Comprehensive maintenance of 1.1 KVA and 2.2 KVA off grid solar inverter systems
Package 1
Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2) (3 (3 ))
Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2) (3 (3 ))
Development Maintenance Management and Operation of Greenfield High-Speed Corridor from Mawlyngkhung (Near Shillong) in Meghalaya to Panchgram in Assam by 4-Laning with Paved Shoulders on HAM (Pkg-2-From Km 45.645 To Km 78.600 Design length 32.955km
Development, Maintenance, Management and Operation of Greenfield High-Speed Corridor from Mawlyngkhung (Near Shillong) in Meghalaya to Panchgram (Near Silchar) in Assam by 4-Laning with Paved Shoulders on Hybrid Annuity Basis. (Package-2: From Km 45+645 To Km 78+600, Design Length – 32.955 Km).