Publication date
Bid document dated / published 03-09-2026 (Bid Number GEM/2026/B/7951892).
- Organisation shown as Indian Army under Department Of Military Affairs, Ministry Of Defence.
Loading…
Indian Army · Kamrup, Assam9795251
Written by TenderKart AI from the documents published when it was generated. Check the tender for later corrigenda before you bid.
3 Sept 2026
18 Sept 2026
₹5.7 L
All important dates as they stand after corrigenda: publication, pre-bid/clarification deadline, bid submission deadline, bid opening, and bid validity period.
Bid document dated / published 03-09-2026 (Bid Number GEM/2026/B/7951892).
After Date corrigenda, bid end stands at 18 Sep 2026 09:00 UTC; original bid PDF showed 14-09-2026 14:00:00.
After Date corrigenda, bid opening stands at 19 Sep 2026 09:00 UTC; original bid PDF showed 15-09-2026 14:00:00.
Bid Offer Validity is 120 Days from the Bid End Date.
No pre-bid meeting date or separate pre-bid query deadline is stated in the bid pack.
Tender value or estimated cost, EMD/bid security (amount, acceptable forms, validity), tender document fees, performance security, and key payment terms.
No numeric Estimated Bid Value or tender cost is printed in the downloaded bid PDF; EMD is given as an absolute amount.
EMD Amount is INR 5,66,227; Advisory Bank State Bank of India; beneficiary COMMANDANT.
No tender fee or bid participation fee is charged in this bid.
ePBG Percentage is 3.00% for 14 Months; Advisory Bank State Bank of India; FDR alternative also allowed.
For goods, GTC provides 100% payment within 10 days of CRAC and online bill submission, unless STC/ATC specify otherwise; payment due only after Performance Security receipt.
Order may be split 70:30 between maximum 2 bidders; MII and MSE purchase preferences apply.
Every pass/fail eligibility and qualification requirement: experience and past performance, turnover/net worth, registrations and certifications, consortium/JV rules, and debarment or blacklisting conditions.
Only OEM or OEM-authorised dealer may participate; only Class 1/Class 2 local suppliers are allowed (non-local suppliers not eligible).
Bidder minimum average annual turnover 70 Lakh(s) for 3 years; OEM average turnover 113 Lakh(s) (last 3 years).
3 years past experience required; past performance 80% of bid quantity; plus project-experience order-value thresholds on estimated bid value.
ISO 9001 required for bidder or OEM; product certificates per specification; NABL/Govt lab test certificate (≤3 months) with bid; genuine-defence-spec confirmation.
Bidder must not be under liquidation, court receivership or similar proceedings, or bankrupt; faulty/incorrect documents cause rejection.
MSE purchase preference available only to manufacturer/OEM on GeM with valid Udyam (traders excluded); MII Class-1 preference needs local-content certificate.
No consortium or joint-venture participation rules are stated in the bid documents.
What is being procured: the work, supplies or services, deliverables and quantities, locations, phases, completion or delivery timelines, applicable standards, and notable exclusions.
Supply of 3064 pieces of Bed Mattress Conforming to IS 13489 (V3) (Q2).
As per GeM Category Specification for IS 13489 (V3), plus buyer additional parameters and defence part/sample conformity.
Full quantity 3064 to consignee at KAMRUP within 30 Delivery Days.
Inspection required: Post Dispatch by Board of Officers; post-receipt inspection at consignee site before acceptance.
The complete checklist of documents to submit — mandatory vs conditional, with any prescribed formats, proformas or annexures — plus how to submit: portal and mode, envelope/cover structure, digital signature requirements, signing and attestation rules, and physical originals with their deadline.
Online two-packet bid on GeM; seller documents listed in bid detail must be uploaded with the bid.
EMD instrument hardcopy to Buyer within 5 days of Bid End/Opening if FDR route used; Performance Security original FDR within 15 days of award.
ATC acceptance and several declarations must be on bidder letter head with signature and official seal; Anti-Collusion Certificate requires authorised signature.
Every corrigendum/addendum in order — what changed (original vs amended value), its impact, and the action for the bidder — ending with the values that finally apply.
Three corrigenda are recorded for this tender, but no corrigendum attachment files are present in the downloaded document pack.
Date corrigenda moved bid end/opening later than the original 14-09-2026 / 15-09-2026 values printed in the bid PDF; final portal state used for this answer is Bid End 18 Sep 2026 09:00 UTC and Opening 19 Sep 2026 09:00 UTC.
A Representation-type corrigendum was published on 2026-09-14, but its content is not available because no file is attached in the pack.
Final dates: End 18 Sep 2026 09:00 UTC; Opening 19 Sep 2026 09:00 UTC; Validity 120 days from end; EMD INR 566227; ePBG 3% for 14 months; qty 3064; DP 30 days; no other textual amendments are evidenced in pack files.
Genuine conflicts within and across the documents (original vs corrigenda, clause vs annexure, tender document vs BOQ): both sides with citations, and which value prevails.
Bid PDF still prints End 14-09-2026 14:00 and Opening 15-09-2026 14:00, while Date corrigenda (no files) leave final portal end/opening at 18/19 Sep 2026 09:00 UTC.
Category table allows Overall Width 900 mm (+/-15 mm), while additional parameter describes 198X91.5X10.2CM rubberised coir mattress.
Bid detail selects Post Dispatch inspection by Board of Officers, while clause 17 marks pre-dispatch NA and post-receipt inspection at consignee by Station Board of Officers.
Buyer ATC FDR clause says hardcopy within 5 days of Bid End date/ Bid Opening date; GeM GTC says within 5 working days of bid opening.
Experience thresholds are % of estimated bid value, and a clause refers to Estimated Bid Value indicated above, but no numeric estimated value appears in the extracted bid detail pages.
MSE/Startup relaxation for years of experience and turnover is No, while MSE purchase preference and manufacturer EMD exemption still apply under GeM/policy clauses.
Only critical, tender-specific pre-bid queries that could materially change bid/no-bid, pricing, eligibility or contractual risk. Skip generic or obvious questions the documents already answer clearly.
What is the exact Estimated Bid Value to be used for 35%/20%/15% past-project order thresholds and 80% quantity past-performance computation?
Please share depot sample access process, defence part drawing/spec for K3/KND/NIV/BK-4, and whether length 198 cm and thickness 10.2 cm are mandatory absolute values or nominal.
For the mandatory lab test certificate ≤3 months old, which exact tests/standard methods against which defence specification must be reported, and must the tested sample be the offered production lot construction?
Does the 30-day delivery period include advance-sample approval time, transit to Kamrup, and Board of Officers/post-receipt acceptance, and will DP be re-fixed without LD for buyer-side sample delay as stated?
Is Functional Service Centre in Assam required for this mattress supply, and will payment be withheld until service-centre proof is submitted?
Provide full postal/hand-delivery address for COMMANDANT hardcopy EMD/FDR and confirm whether the 5-day clock runs from Bid End date or Bid Opening date (working days or calendar days).
Commercial, legal and execution risks a bidder should weigh: liquidated damages and penalties, unusual or one-sided clauses, tight timelines, and payment or security risks.
3064 mattresses to Kamrup in 30 days after award, with 2 advance samples due in 7 days before bulk production, creates high LD/default risk.
LD @ 0.5% of contract value of delayed quantity per week (or part), cap 5% normally and up to 10% for inordinate delay (>25% of completion period).
Even after NABL certificate at bid stage, final acceptance rests on Buyer’s Lab and Station Board conformity to defence part/depot sample.
EMD INR 5,66,227 and 3% performance security for 14 months (GTC validity to warranty+2 months) lock capital; payments due only after PS verification.
70:30 split among up to 2 bidders, Bid-to-RA with H1 elimination, and concurrent MII/MSE preferences can reduce awarded quantity and force price matching.
Broad buyer termination rights; ATC ties depot-sample failure and GeM incident history to participation/performance consequences.
Seller must invoice strictly per Contract Order; quantity accepted only up to a maximum of two times; excess/multiple invoices not accepted.
The inviting authority and relevant contacts: office, person, designation, address, phone and email — and which address receives physical submissions, if any.
Ministry Of Defence — Department Of Military Affairs — Organisation: Indian Army; office name masked in bid PDF.
HOD grievance email [email protected]; Buyer email [email protected].
No usable unmasked postal address for EMD/PBG hardcopy delivery is printed; instruments are in favour of COMMANDANT.