Tender notice / publication
e-Tender Notice No. 02/2026-27 is dated 31.08.2026 (Second Call). Tender documents are downloadable free of cost on https://tntenders.gov.in from 03.09.2026 to 05.10.2026 up to 5.45 p.m.
Loading…
Arulmigu Kapaleeswarar Temple · Chennai, Tamil Nadu2026_HRCE_701460_1
Written by TenderKart AI from the documents published when it was generated. Check the tender for later corrigenda before you bid.
5 Sept 2026
6 Oct 2026
₹26.3 Cr
₹13.3 L
All important dates as they stand after corrigenda: publication, pre-bid/clarification deadline, bid submission deadline, bid opening, and bid validity period.
e-Tender Notice No. 02/2026-27 is dated 31.08.2026 (Second Call). Tender documents are downloadable free of cost on https://tntenders.gov.in from 03.09.2026 to 05.10.2026 up to 5.45 p.m.
No fixed pre-bid meeting date or clarification deadline is prescribed. Bidders may obtain further information during a Pre-Bid Meeting, if any, or contact the Joint Commissioner/Executive Officer.
Filled e-tenders must be submitted online only on or before 3.00 p.m. on 06.10.2026 (server system clock).
Pre-qualification tender opening is online at 4.00 p.m. on 06.10.2026 by the Joint Commissioner, A/M Kapaleeswarar Temple.
Tender remains valid for ninety (90) days from the last date of receipt of tender, extendable by written consent up to a further maximum of ninety (90) days.
Period of work / contract is 18 months from handing over of site/premises, with a prescribed monthly rate-of-progress schedule.
Tender value or estimated cost, EMD/bid security (amount, acceptable forms, validity), tender document fees, performance security, and key payment terms.
Tender / estimated value is Rs. 26,30,17,735/- for Construction of Arulmigu Kapaleeswarar Arts and Science College Phase-2.
EMD is Rs. 13,25,089/-, payable only through online payment on https://tntenders.gov.in (calculated as 1% up to Rs.20 lakhs and ½% for the balance). Notice states EMD should be remitted online only from any Nationalised bank in the name of Arulmigu Kapaleeswarar Temple. No separate EMD instrument validity/claim period is stated beyond online remittance.
Tender documents are downloadable free of cost from https://tntenders.gov.in.
On acceptance, successful tenderer must make security deposit of 2% of the value of contract (amount over and above EMD already remitted). After negotiation under TNTA s.10(3), SD shall be not less than 2% of negotiated price in DD, banker’s cheque, specified small savings instruments, irrevocable bank guarantee, or cash deposit to the temple account. EMD and additional SD (if any) are to be converted into National Savings Certificates/Accounts pledged in favour of the Executive Officer, HR&CE concerned.
If overall quoted amount is 5–15% below value put to tender, additional security of 2% of estimated value put to tender is payable. If discount exceeds 15%, Additional Security Deposit is 50% of the difference between quoted amount and estimated value. Must be furnished within 15 days of acceptance order with agreement execution, else award cancelled and EMD forfeited.
Running bills: intermediate payment of 95% of certified work value within 14 days of certificate; 5% withheld. For original building contracts, 3½% withheld from final bill is retained one year then released on indemnity bond for further four years (structural stability). No interest on arrears/guarantee fund. Quotes must exclude GST; 18% GST (9% CGST+9% SGST) applies to works contracts and is calculated on total tendered value excluding GST. TDS 1% SGST + 1% CGST where supply under contract exceeds two lakh rupees. No payment/advance for unfixed materials.
In lieu of revenue solvency, Schedule D financial documents are required; header states at least 6% of the contract value shall be fixed for the solvency-related capability amounts (blank filled amounts in form). PQ also requires annual turnover ≥150% of estimated annual value put to tender in any one of preceding 5 years; share capital/reserves ≥20% of work value; working capital ≥ one month current activity including this work.
Every pass/fail eligibility and qualification requirement: experience and past performance, turnover/net worth, registrations and certifications, consortium/JV rules, and debarment or blacklisting conditions.
Must be a registered live Class IA and above State-level civil contractor (PWD or other TN Government Departments / State Government undertakings) with revised monetary limit; registration/live certificate and letter of class registration to be uploaded.
Applicant must remain in the same Name and Style in Civil/Electrical Engineering field for at least past 5 years (individual-to-firm conversion allowed if individual remains partner with 5 years experience). Must produce registration and live certificate evidence.
For electrical-related works, produce licence issued by Government/Quasi-Government/Statutory Boards etc., with valid dealership order from original manufacturers. If tenderer is not a registered electrical contractor for connected electrical works, produce consent letter from ESA/EA/ESB/EB licensed electrical contractor.
Must show major works completed in past 5 years and satisfactorily completed either (i) one similar work ≥50% of proposed contract in a single agreement in any one of preceding 5 years, or (ii) two similar works in two agreements each ≥25% of proposed contract value in any one of preceding 5 years. Private works allowed with notarised affidavit; EE, PWD genuineness certificate after inspection; TIA verification that contract amount reflects in IT assessment. Values escalated to current price at 10% p.a. cumulative.
Annual financial turnover ≥150% of estimated annual value put to tender in any one of preceding 5 years. Issued/called-up share capital and capital reserves ≥20% of work value. Working capital (bank balance + unutilised OD/credit from RBI-approved bank) must exceed one-month current activity including this work; bank certificate IN ORIGINAL. Schedule D substitutes revenue solvency: Banker’s Solvency (Annex-II), Net Worth (Annex-III), Annual Turnover past 3 years (Annex-IV), and digitally signed indemnity bond on Rs.200 non-judicial digital stamp (Annex-V). Encumbrance certificate not applicable.
Produce Income Tax SARAL for preceding 5 years and GSTIN/GSTR filed copy for current year. Income-tax verification certificate (valid one year) required with tender; proprietary/partnership certificates for proprietor/each partner. GST registration number copy to be furnished. Bank turnover certificate for last one year with UDIN required.
No contract terminated/rescinded for breach in past 5 years by any agency; notarised affidavit & undertaking required. No negative remarks (cost of repairs/reconstruction) from employer-in-charge during contract or 5-year liability period.
Need Project Manager and Site Engineers (Degree/Diploma Civil/Electrical) with prescribed field experience; notarised affidavit, consent letters and qualification/experience certificates. For contracts above Rs.50 lakhs, Project Manager with Conservation Architecture/Civil degree and ≥2 years heritage conservation experience plus additional BE/diploma staffing per matrix. Tools & plants: self-certification / RC books / lease agreements; notarised affidavit. SE ensures T&P and technical staff availability at agreement stage per milestone needs.
Excessive/profiteering quotes may attract permanent or period debarment. False/forged/incomplete PQ particulars → non-responsive rejection under TNT Rules s.28 Ch.6. Discrepant bank turnover certificates may lead to rejection and blacklisting. Failure to attend office after shortlisting, non-payment of SD, or backing out → EMD forfeiture.
No consortium or joint-venture bidding framework, equity floors, or JV size caps are set out. Bids may be by individual, firm (co-partnership) or corporation with prescribed signing/authorisation evidence.
What is being procured: the work, supplies or services, deliverables and quantities, locations, phases, completion or delivery timelines, applicable standards, and notable exclusions.
Construction of Arulmigu Kapaleeswarar Arts and Science College Building Phase-2 belonging to Arulmigu Kapaleeswarar Temple, Mylapore, Chennai-04; two-cover PQ & price bid works tender above Rs.5 crores under HR&CE / Joint Commissioner-Executive Officer.
Works relate to the college block (Phase-1 & Phase-2 shown on drawings) under Arulmigu Kapaleeswarar Temple, Mylapore, Chennai-600 004. Ground floor and upper floor plans are issued; Schedule B lists temple drawings to be signed by contractor and entering officer.
Item-rate BOQ with 216 Schedule A items including sub-items (BOQ shows main item lines spanning civil structure, finishes and building services). Major civil scope includes 600 mm dia bored cast-in-situ M30 piles (3090 RM), under-reamed piles, pile load tests (IS 2911), earthwork, GSB, anti-termite, PCC/RCC M25–M30, reinforcement, centering, fly-ash brickwork, doors/windows (flush, WPC, UPVC), SS handrails, flooring/finishes, roofing, painting, aluminium works, plus MEP/services such as water supply/sanitary, fire, lifts, electrical panels/cabling, lightning protection, CCTV/data networking and UPS.
18-month contract from site handover with monthly cumulative progress from 5% (1st month) stepping upward, and quarterly milestones (15%/30%/45%/60%/75%/100%). Time is essence of contract.
Works under Tamil Nadu Building Practice (TNBP), NBC references in Schedule A, IS codes for piles/concrete (e.g. IS 456, IS 2911). Contractor arranges water and temporary EB service (disconnect on completion), inspects site/soils before tendering, maintains work at contractor’s risk with insurance against natural calamities until taken over, uses clean river sand or M-sand, pays royalty on private quarries, and follows BOCW Rules 2006 registration/renewal.
The complete checklist of documents to submit — mandatory vs conditional, with any prescribed formats, proformas or annexures — plus how to submit: portal and mode, envelope/cover structure, digital signature requirements, signing and attestation rules, and physical originals with their deadline.
Open e-tender, two-cover system (Pre-Qualification & Price Bid) submitted only online via https://tntenders.gov.in. All relevant documents in PDF. Corrigenda/notifications only on the portal, not newspaper. BOQ template must not be modified; upload after filling allowed columns.
All pages of the tender and all Conditions, Plans & Schedules must be digitally signed. Schedule D financial documents must be digitally signed and uploaded or tender rejected. DSC associated with Class IA registration is listed in Annexure-I particulars.
PQ documents evaluated first; only bidders passing all PQ criteria proceed to price-bid evaluation. Tender form must be filled while uploading or liable to rejection. After shortlisting, lowest under-consideration bidder must furnish PERT chart matching departmental time schedule within one week of call letter.
Bid submission is online; no separate physical bid-envelope deadline is prescribed. Working-capital bank certificate must be IN ORIGINAL (as a PQ document). Successful bidder may be required to attend JC/EO office on written intimation and convert EMD/additional SD into NSC/accounts pledged to EO, HR&CE.
Every corrigendum/addendum in order — what changed (original vs amended value), its impact, and the action for the bidder — ending with the values that finally apply.
The downloaded tender set contains no corrigendum or addendum file, and tender-pack contents show only the original NIT, PQ extract, two-cover conditions, drawings and BOQ. Bidders must still check https://tntenders.gov.in before bid submission because the notice states corrigenda will be published only on the portal.
Genuine conflicts within and across the documents (original vs corrigenda, clause vs annexure, tender document vs BOQ): both sides with citations, and which value prevails.
Instructions state 2½% of work value is retained from completion for one year (plus four-year indemnity; five-year defect liability). GCC cl.64.1 for original buildings withholds 3½% from the final bill for one year then indemnity for four years. Both regimes appear in the same tender set without reconciliation.
Special Instructions require converting EMD and additional SD into NSC/Accounts pledged to EO, HR&CE. Negotiation clause 49 also allows DD, banker’s cheque, small savings, irrevocable BG or cash to temple account for ≥2% of negotiated price. Post-award security mechanics are stated in overlapping forms.
Cover/instructions/BOQ alternate spellings “Kabaleeswarar” and “Kapaleeswarar” for the same temple/college work; treat as the same project (Arulmigu Kapaleeswarar Temple, Mylapore).
Monthly rate-of-progress table in Instructions cl.26 lists months 1–16 (up to 80%) on the extracted page, while contract period is 18 months and quarterly milestones run to 100% at 6th quarter. Completion-month percentages for months 17–18 should be confirmed from the Rate of Progress sheet/PERT requirement.
Only critical, tender-specific pre-bid queries that could materially change bid/no-bid, pricing, eligibility or contractual risk. Skip generic or obvious questions the documents already answer clearly.
Ask TIA which withheld retention applies at final bill for this original college building—Instructions cl.18/35 (2½% + 4-year indemnity) or GCC cl.64.1(A) (3½% + 4-year indemnity)—and how this interacts with the 5% running-bill withhold and 2% SD.
Schedule D leaves Banker’s Solvency, Net Worth and 3-year Turnover minimum amounts blank while stating at least 6% of contract value shall be fixed. Seek written figures (ideally ≥6% of Rs.26,30,17,735 ≈ Rs.1,57,81,064) so PQ financial papers are not rejected for under-certification.
Clarify whether similar work must be multi-storey educational/institutional buildings, any major building, and whether pile foundation + integrated electrical/fire/lift/CCTV packages must be in the same single agreement for the 50%/25% thresholds.
Staffing matrix for >Rs.50 lakh requires a Project Manager with Conservation Architecture/Civil degree and ≥2 years heritage conservation experience. Confirm whether this heritage PM is mandatory for this new college Phase-2 building or only for heritage/thiruppani works.
Bored pile item states routine test (1.5× safe load, 1 in 100 piles) cost is not included, while separate BOQ items exist for initial and routine load tests. Confirm payment mechanism, quantity assumptions, and whether failed tests/re-tests are contractor’s risk.
Seek single accepted list of instruments and payee details for residual 2% SD / additional SD after online EMD, given NSC-pledge instruction versus negotiation clause allowing BG/DD/cash to temple account.
Confirm that comparative evaluation uses quoted amount excluding GST, that 18% GST is paid extra on running bills as per actual GST law, and how TDS (1%+1%) and ITC interact with temple/HR&CE as recipient.
Commercial, legal and execution risks a bidder should weigh: liquidated damages and penalties, unusual or one-sided clauses, tight timelines, and payment or security risks.
Time is essence. Liquidated damages apply for lapses/shortfall against rate-of-programme milestones; GCC cl.57 allows notice, determination, forfeiture of EMD, SD and withheld amounts, taking possession of plant/materials, and recovery of excess completion cost if progress lags or work is suspended/sublet without sanction.
Rs.13.25 lakh online EMD, top-up to 2% SD on award, extra SD if bid is 5–15% or >15% below estimate, 5% running retention, and no advance on unfixed materials. Low-bid additional SD due within 15 days of acceptance.
For permanent buildings, retention for one year plus indemnity bond for four further years; contractor must rectify defects/substandard work at own cost across the five-year liability window. No interest on withheld moneys/arrears.
Submitting tender implies full soil/site inspection with no later claim. Contractor provides water and temporary power, risk insurance until takeover, royalties for private quarries, BOCW registration/fees, and makes good damage to adjoining buildings/fittings without extra.
Although full price adjustment applies (value >1 crore; period >12 months) when indices move >3%, escalation is limited to quantities per original milestone timeline, uses lesser of scheduled-quarter or actual-use index if late, and ceases for work done beyond agreement period—shifting delay-related inflation risk to contractor. Adjustment works both upward and downward.
Schedule quantities are approximate and alterable at JC/EO discretion; EE may order modifications/omissions/additions. Under TNTA s.10(3), accepting authority may negotiate price reduction with lowest tenderer only if above market/SoR.
Missing Schedule D upload, IT certificate, digital signatures, or false working-capital/ongoing-work particulars trigger summary rejection; turnover certificate discrepancies can lead to blacklisting. PQ failure bars price-bid opening.
Claims ≤ Rs.50,000 go to departmental arbitrator (not below Additional Commissioner, HR&CE per tender form); claims > Rs.50,000 only through competent civil court—limiting fast contractual remedies on a Rs.26+ crore job.
Default in deploying prescribed technical assistants attracts Rs.2,000/month (diploma) or Rs.5,000/month (degree) penalties. Apprentices Act and ex-toddy tapper/ex-servicemen employment clauses add compliance burden; Apprentices Act breach can cancel contract.
The inviting authority and relevant contacts: office, person, designation, address, phone and email — and which address receives physical submissions, if any.
Joint Commissioner / Executive Officer, Arulmigu Kapaleeswarar Temple (A/M Kapaleeswarar Temple), Mylapore, Chennai – 600 004. Online tenders received and opened by this office; under-consideration bidders may be called to attend this office.
NIT names P.K. Kaventtha, B.A., B.L., M.H.R.M., Joint Commissioner/Executive Officer; and Chairman, Board of Trustees P. Vijayakumar Reddy (with other names printed on the notice block).
e-Procurement portal https://tntenders.gov.in is the sole channel for documents, bids and corrigenda. For further necessary information, contact the Joint Commissioner/Executive Officer (or Pre-Bid Meeting if any). No phone number or email ID is printed in the tender notice/conditions pack.
College block drawings are signed/issued under AE, Kapaleeswarar Temple, and Joint Commissioner/Executive Officer, Arulmigu Kapaleeswarar Temple, Mylapore, Chennai-600004.