RFP availability / document download window
Bid documents available on CPPP and BIMS from 07.08.2026 to 21.09.2026 up to 12.00 Hrs IST.
- NIT letter dated 03.08.2026 (Letter No. 2681).
- No corrigendum issued; these dates stand as published.
Loading…
Construction of Mahendra Tanaya Bridge at Km 92.250 Design Chainage 1.230 km on NH 326A in the State of Odisha on EPC mode
Ministry of Road Transport and Highways · Gajapati, Odisha2026_MoRTH_920868_1
Written by TenderKart AI from the documents published when it was generated. Check the tender for later corrigenda before you bid.
7 Aug 2026
21 Sept 2026
₹29.6 Cr
₹29.6 L
All important dates as they stand after corrigenda: publication, pre-bid/clarification deadline, bid submission deadline, bid opening, and bid validity period.
Bid documents available on CPPP and BIMS from 07.08.2026 to 21.09.2026 up to 12.00 Hrs IST.
Pre-bid queries by email to [email protected] on or before 25.08.2026 up to 15.00 hrs IST; Authority response latest by 02.09.2026 (15 hrs IST).
Technical and Financial Bids must be submitted online on CPPP on or before 21.09.2026 up to 12.00 hours IST.
Physical originals listed in RFP Clause 2.11.2 must reach the Authority on or before 25.09.2026 up to 11.00 hours IST.
Online bids opened on 25.09.2026 after/at 15:30 hours IST.
BID valid for 120 days from the BID Due Date (i.e. from 21.09.2026).
Indicative post-opening milestones: eligible bidders ~60th day from NIT; financial opening ~68th day; LOA ~75th day; signed LOA return ~82nd day; Performance Security within 30 days of LOA; Agreement within 10 days of receipt of 50% PS/APS.
Tender value or estimated cost, EMD/bid security (amount, acceptable forms, validity), tender document fees, performance security, and key payment terms.
Estimated Project Cost is Rs. 29.56 Cr (including GST).
BID Security Rs. 29.56 lakhs (Twenty-Nine lakh and Fifty-Six Thousand only).
Tender document fee Rs 11,800 (Rs 10,000 + 18% GST Rs 1,800) payable online on NTRP/bharatkosh.gov.in; receipt/TR uploaded online and original with hard copy.
Performance Security = 3% of Bid Price; Additional Performance Security applies if bid is abnormally low, on a stepped percentage formula.
Lump-sum EPC Contract Price paid by stage payments per Schedule-H; interest-bearing mobilisation advance available; maintenance paid annually as % of Contract Price over DLP.
Every pass/fail eligibility and qualification requirement: experience and past performance, turnover/net worth, registrations and certifications, consortium/JV rules, and debarment or blacklisting conditions.
Single-entity bidders only — Joint Venture is not allowed because Estimated Project Cost (Rs. 29.56 Cr) is up to Rs. 100 crore.
Threshold Technical Capacity Rs 22.17 Crore over past 10 financial years; stand-alone major-bridge similar-work criteria apply.
Minimum Net Worth Rs. 1.48 crore; minimum Average Annual Turnover Rs. 5.91 crore (updated) over last 5 FYs; Available Bid Capacity must exceed total BID value.
Conflict of Interest disqualifies and triggers Bid Securing Declaration consequences; extensive MoRTH non-performer / debarment triggers apply.
What is being procured: the work, supplies or services, deliverables and quantities, locations, phases, completion or delivery timelines, applicable standards, and notable exclusions.
EPC construction of Mahendra Tanaya Bridge at Km 92.250 (Design Chainage 1.230 km) on NH-326A in Odisha, Bid Ref No. 07 CCE NH SOUTH of 2026-27.
Design-build two-laning with paved shoulders over 2.300 km including a new major bridge, SVUP, approaches, safety works, and specified utility shifting; then maintain through Defects Liability/Maintenance Period.
Construction Period 12 months (Scheduled Completion Date = 365th day from Appointed Date); Maintenance/Defects Liability Period 120 months (10 years) for this stand-alone bridge.
Works to MoRTH/IRC Specifications and Standards in Schedule-D and relevant Manual; geotechnical investigation report provided for foundation design guidance.
The complete checklist of documents to submit — mandatory vs conditional, with any prescribed formats, proformas or annexures — plus how to submit: portal and mode, envelope/cover structure, digital signature requirements, signing and attestation rules, and physical originals with their deadline.
Online submission only on CPPP https://eprocure.gov.in/eprocure/app; BIMS https://bims.gov.in technical upload is optional; no fax/telex/telegram/physical bid of the full tender.
Class-III DSC mandatory in name of authorised signatory / firm (corporate capacity; Lead Member if JV); bid typed and signed in indelible blue ink by authorised signatory; alterations initialled.
Documents in Clause 2.11.2 go in one sealed envelope marked “BID for the Project.” with bidder name/address and BID Due Date on top-right; addressed to Sri Prakash Kumar Behera, CCE Southern NH Circle, Ambapua, Near City College, Berhampur-760011.
Every corrigendum/addendum in order — what changed (original vs amended value), its impact, and the action for the bidder — ending with the values that finally apply.
No corrigendum or addendum is included in the tender document set; all dates, amounts and conditions remain as originally published in the NIT/RFP dated 03.08.2026.
Final operative values: documents available 07.08.2026–21.09.2026 12:00 IST; queries by 25.08.2026 15:00; responses by 02.09.2026; BID Due Date 21.09.2026 12:00 IST; physical originals 25.09.2026 11:00 IST; technical opening 25.09.2026 15:30 IST; bid validity 120 days; EPC Rs 29.56 Cr; Bid Security Rs 29.56 lakh; tender fee Rs 11,800; completion 12 months; maintenance/DLP 120 months/10 years.
Genuine conflicts within and across the documents (original vs corrigenda, clause vs annexure, tender document vs BOQ): both sides with citations, and which value prevails.
Agreement Art. 3.1 promises ≥90% Construction-Zone RoW within 30 days of Agreement, but Schedule-A Annex-II hands over only 0.120 km on Appointed Date and the remaining ~2.18 km only on the 150th day.
Detailed JV clauses (2.1.11, formats Appendix-IV/V) remain in the RFP, but Clauses 2.1.11(h) and 2.2.1(a) state no JV is allowed up to Estimated Project Cost of Rs. 100 crore — this project is Rs. 29.56 Cr.
Documents mix ‘Chief Construction Engineer, Southern NH Circle, Berhampur’ with ‘Chief Engineer, National Highways, Odisha’, and the draft Agreement cover still shows an old bid reference ‘03 CE NH of 2025-26’.
NIT/Schedule fix physical originals on 25.09.2026 up to 11:00 IST, while one RFP paragraph says ‘latest within 5 working days of the bid due date (up to 11:00 hrs)’.
Clause 1.2.4 says Bid Security is refundable not later than 150 days from BID Due Date, while Clause 2.20.1 requires BG/Surety validity of not less than 180 days inclusive of 60-day claim period.
Only critical, tender-specific pre-bid queries that could materially change bid/no-bid, pricing, eligibility or contractual risk. Skip generic or obvious questions the documents already answer clearly.
Ask Authority to confirm in writing that JV is barred for this Rs 29.56 Cr package and that stand-alone bridge criteria under 2.2.2.2(iii) (with Rs 7.40 Cr / Rs 10.35 Cr and 3×40 m span metrics) are the governing similar-work tests.
Seek confirmation that Annex-II RoW (only 0.12 km on Appointed Date; balance on day 150) is intentional, and how Milestone/Scheduled Completion damages and Time Extension will be measured for approach works not handed over until day 150.
Request itemised provisional amounts for electrical and PH/RWSS shifting included in the Rs 29.56 Cr EPC, confirmation whether supervision charges are excluded only for electrical, and whether delays by utility owners entitle Time Extension without Contractor cost risk.
Request the printed Appendix-XI (Rule 144(xi)) format and confirmation that Agreement cover reference ‘03 CE NH of 2025-26’ is a drafting error superseded by 07 CCE NH SOUTH of 2026-27.
Ask for design HFL/discharge, diversion requirements on Mahendra Tanaya river, and whether soil-report pile lengths/capacities are mandatory minimums or indicative for Contractor’s design responsibility.
Commercial, legal and execution risks a bidder should weigh: liquidated damages and penalties, unusual or one-sided clauses, tight timelines, and payment or security risks.
Only 120 m bridge zone RoW on Appointed Date; ~2.18 km of approaches only on day 150 of a 365-day schedule — high risk of milestone/completion Damages.
Stand-alone bridge attracts 10-year Defects Liability and Maintenance Period with Performance Security held until 60 days after DLP expiry.
Multiple forfeiture triggers on Bid Security; aggressive under-bidding forces large Additional Performance Security calculated on bid price.
Deep pile foundations in variable strata with shallow groundwater; utility shifting interfaces; Contractor bears unforeseeable-difficulty and site-data risk under EPC terms.
Authority may withdraw works up to 10% of Contract Price with only partial price reduction compensation; broad termination and debarment rights on Contractor default.
The inviting authority and relevant contacts: office, person, designation, address, phone and email — and which address receives physical submissions, if any.
Sri Prakash Kumar Behera, Chief Construction Engineer, Southern NH Circle, Berhampur — physical bid-security/PoA packet addressee.
Pre-bid queries only by e-mail to [email protected] by 25.08.2026 15:00 IST.
e-procurement support emails referenced for publication/opening assistance: [email protected] and [email protected].
BG SFMS advice beneficiary details printed in Bid Security BG format: Chief Engineer NHs Odisha / SBI A/c 11109326485 / IFSC SBIN0009025.